Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

186results about How to "Reasonable division" patented technology

Topological map building method of mobile robot and navigation method

The invention reveals a topological map building method of a mobile robot, comprising the following steps: S1: building a current region according to environmental information of current position of a mobile robot; S2: judging whether the current region accords with the sub-region division condition; entering S3 if the current region accords with the sub-region division condition; and entering S4 if the current region does not accord with the sub-region division condition; S3: dividing the current region into at least two sub-regions which contain the sub-region of current position and are connected through a boundary, and then entering S5; S4: considering the current region as the sub-region of the current position, and then entering S5; S5: building a local map at the sub-region of the current position and storing; S6: judging whether there exists a sub-region without local mapping, entering S7 if yes, and entering S8 if not; S7: letting the mobile robot move to the sub-region without local mapping, updating information of the current position and returning to S1; and S8: building a topological map with the sub-region as the node and the boundary as the edge. In addition, the invention also discloses a navigation method of the mobile robot based on the topological map.
Owner:SHEN ZHEN 3IROBOTICS CO LTD

Video keyframe extraction method

The invention discloses a video keyframe extraction method, which comprises the steps of: using a ViBe algorithm fused with an inter-frame difference method to perform moving object detection on an acquired original video sequence, so as to obtain a key video sequence containing a moving object; performing keyframe crude extraction on the key video sequence by using a global characteristic peak signal-to-noise ratio to obtain candidate keyframe sequences; and establishing global similarity of the candidate keyframe sequences by using the peak signal-to-noise ratio, establishing local similarity of the candidate keyframe sequences by using SURF feature points, and performing weighted fusion on the global similarity and the local similarity to obtain comprehensive similarity, performing self-adoptive keyframe extraction on the candidate keyframe sequences by using the comprehensive similarity, and finally acquiring a target keyframe sequence. The video keyframe extraction method providedby the invention can effectively extract the video keyframes, obviously reduce the redundant information of video data, and express the main content of the video concisely. Moreover, the video keyframe extraction method has low algorithm complexity and is suitable for real-time extraction of keyframes of surveillance videos.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Method for multi-user dispatching transmission based on 3D-MIMO codebook design

The invention discloses a method for multi-user dispatching transmission based on 3D-MIMO codebook design. The method comprises the steps that an even flat board array is adopted by a base station antenna, a direct product codebook for 3D-MIMO is adopted, a horizontal codebook in the direct product codebook is a DFT codebook, and a vertical codebook is obtained through space division; the codebooks are grouped according to basic beam directional diagrams corresponding to codons in the direct product codebook, and the limiting feedback quantity is calculated by users according to the codebook grouping condition and a channel estimation result and is fed back to a base station through a feedback channel; the users are paired and dispatched by the base station according to the limiting feedback quantity of the users and multi-user transmission is conducted. Compared with a two-dimension codebook, a traditional three-dimensional DFT direct product codebook and multi-user transmission methods of the two-dimension codebook and the traditional three-dimensional DFT direct product codebook, the use rate of a system frequency spectrum and the handling capacity performance are improved.
Owner:上海瀚芯实业发展合伙企业(有限合伙)

Distribution network power supply area division method based on comprehensive evaluation

The invention relates to a method for distribution system planning and particularly relates to a distribution network power supply area division method based on comprehensive evaluation. The method comprises the following steps: first, a power supply area to be divided is selected, the status of the power supply area and main factors influencing power supply area division are analyzed and an evaluation index system for power supply area division is established; then, an appropriate method is selected to set weights of evaluation indexes and evaluation standards; and finally, comprehensive evaluation is carried out to determine a division result of the power supply area. The method overcomes the defect that the prior method carries out qualitative classification only based on experiences of experts or leaders. Based on factors influencing distribution network power supply area division, a comprehensive evaluation method is fully utilized and the defect that power supply area division can only be carried out on the basis of quantitative indexes in a clustering analysis method is overcome. The power supply area can be comprehensively evaluated, the weights of the indexes can be adjusted according to actual situations of various regions, the accuracy of the method is greatly improved, and the method has very high engineering application values.
Owner:STATE GRID CORP OF CHINA +3

Multi-line cutting machine

The invention relates to a multi-wire cutting machine. A machine body of the multi-wire cutting machine consists of a base and an upright post as a whole. The front area of the upright post at the front of a machine tool is a cutting area; a frame is fixedly installed at the back of the upright post; the middle part of the frame is an area managing water, gas, plasma and electricity; wire management areas are in the frames on the two sides of the area managing water, gas, plasma and electricity; and a regulator cubicle is arranged outside the body, and is connected with the wiring terminal of the area managing water, gas, plasma and electricity. The areas of the invention are divided reasonably, the structure is compact, the space structure is fully and effectively utilized, and the operation area is independent and safe. The forefront wire cutting area is designed into an arc shape for convenient operation; the wire management areas are on the two left and right sides of the body, the less third wheel, the safer, and steel wires can carry out automatic reciprocating operation with periodic duty. The area managing water, gas, plasma and electricity is at the back of the cutting area, the control units of water, gas, and plasma are arranged therein, the operation and the maintenance are convenient, an operator can operate wherever in the operation area, and the operation is convenient.
Owner:DALIAN LIANCHENG NUMERICAL CONTROL MACHINE

Turbo generator set vibration fault diagnosis method based on forward reasoning

The invention discloses a turbo generator set vibration fault diagnosis method based on forward reasoning. After a diagnosed turbo generator set starts, a parameter detection device is employed to carry out real-time detection on related work parameters in a start and operation process of the diagnosed turbo generator set and synchronously sends the detection information to a vibration fault diagnosis device for automatic vibration fault diagnosis, vibration faults of the diagnosed turbo generator set are diagnosed level by level by the vibration fault diagnosis device according to the detection result transmitted by the parameter detection device in combination with the active power value of the diagnosed turbo generator set, and the fault diagnosis process comprises steps of 1, shaft vibration swinging value diagnosis; 2, start process vibration fault diagnosis; 3, zero load operation vibration fault diagnosis; and 4, loaded operation vibration fault diagnosis. The method is advantaged in that the steps are simple, and the method is reasonable in design, is convenient to realize, has good use effects, can conveniently and rapidly accomplish the online steam turbine vibration fault diagnosis process and can further realize accurate and reliable diagnosis results.
Owner:XIAN XIRE VIBRATION INST CO LTD

Method for controlling drive modes of four-wheel drive strong hybrid automobile

The invention discloses a method for controlling drive modes of a four-wheel drive strong hybrid automobile, belonging to the field of strong hybrid automobiles. The method comprises: a strong hybrid automobile comprises an engine, an electric generator and a drive motor, wherein the engine and the electric generator are arranged on a front shaft in parallel, and the drive motor is arranged on a rear shaft; the drive modes are as follows: 1) an initialization mode, 2) a pure motor drive mode, 3) a serial hybrid drive mode and 4) a four-wheel drive mode; and when a corresponding condition is satisfied, the corresponding mode is controlled to be started. The invention has the following beneficial effects: by arranging the engine and the electric generator on the front shaft in parallel to form parallel hybrid and then arranging the drive motor on the rear shaft to form a strong hybrid system, the four-wheel drive can be realized under the ice-snow, sloppy and other atrocious road conditions or extreme road conditions, and the trafficability of the automobile is improved; and since the drive modes comprise the initialization mode, the pure motor drive mode, the serial hybrid drive mode and the four-wheel drive mode and are reasonably divided, the energy utilization efficiency of the automobile is effective improved and the energy consumption of the whole automobile is saved.
Owner:CHERY AUTOMOBILE CO LTD

A link resource management method and transmission method and network device

The invention discloses a link resource management method, the core idea of ​​which is to reserve the link resource according to the group to which the resource request object belongs, and according to the policy that the objects in the same group share resources as much as possible. In the present invention, the path calculation unit that performs reserved path calculation can be distributed and configured on each network edge device; it can also be centralized, and at this time, the update of resource reservation information also needs to be released to the centralized path calculation unit . The present invention also provides a transport network and related network equipment applied to the method, including network edge equipment and path calculation units. Since the present invention performs shared processing on the reserved resources according to the determined object groups, the objects can be grouped according to the actual characteristics, and the divided shared resources can be fully utilized, so that the division of link resources is more reasonable and accurate, and the transmission network can be improved. Resource utilization, improving operator benefits and correspondingly reducing the effect of business user expenditures.
Owner:GLOBAL INNOVATION AGGREGATORS LLC

AVS (Audio Video Standard) intra mode decision method and AVS intra mode decision device

The invention discloses an AVS (Audio Video Standard) intra mode decision device, comprising an intra mode decision scheduling control module, an intra prediction module, a rate-distortion cost calculation and mode decision module and an intra mode decision output module. The intra mode decision scheduling control module is used for controlling a series of processing flows, such as input, command control, function scheduling and data output of the intra prediction module, the rate-distortion cost calculation and mode decision module and the intra mode decision output module; the intra prediction module is used for generating the corresponding prediction data in each mode of each data block so as to enter a rate-distortion optimization flow line, and the intra prediction module performs intra prediction by reconstructed data; the rate-distortion cost calculation and mode decision module is used for calculating the rate-distortion cost of each mode, simultaneously performing intra mode decision and outputting the result to the intra mode decision output module; and the intra mode decision output module is used for outputting the mode information of the optimal mode, the reconstructed data and the entropy coding information. Meanwhile, the invention also discloses an AVS intra mode decision algorithm.
Owner:PEKING UNIV

Electric-vehicle recharging station planning method

The invention discloses an electric-vehicle recharging station planning method. The method comprises the following steps: 1) using recharging station annual-running-income maximization as an objectivefunction to establish an electric-vehicle recharging station planning model; 2) analyzing electric-vehicle recharging power demand in a planning area; 3) introducing weights of a weighted Voronoi diagram to analyze recharging station service regions; 4) utilizing a particle swarm optimization algorithm for solving of optimal values of recharging station planning, and simulating optimization selection of various charging station planning schemes through using continuous optimization processes of particles characterizing recharging station positions and capacity. According to the method, the weighted Voronoi diagram is used to solve the established optimization model, the defects of conventional optimization algorithms on service region division and load rate control are overcome, service region division of each recharging station in a planning scheme is enabled to be more reasonable, load rates are also more balanced, and maximum income of recharging station site selection and capacitydetermination taking into account double silver influences of a power network and a transportation network is realized.
Owner:NANJING UNIV OF SCI & TECH

Ervice method, a device, a system, a certificate terminal and a medium for conveniently obtaining certificates

InactiveCN109509131AGuaranteed Authenticity and AccuracyRealize personnel diversionData processing applicationsCharacter and pattern recognitionConsent TypeOperating system
The invention discloses a service method, a device, a system, a certificate terminal and a medium for conveniently obtaining certificates. The method comprises the following steps: obtaining the identity information of a certificate obtaining person; Judging whether the business application of the card handler is the first application for the certificate according to the identity information of the card handler, if so, sending the video examination request of the card handler to the background service equipment, if not, performing subsequent business application operation; When receiving the consent instruction sent by the background service equipment, accepting the video audit of the card handler; After completing the video audit of the licensing personnel, sending the instructions by thebackground service equipment are received, and if the instructions sent by the background service equipment are the approval application instructions, carrying out the subsequent business applicationoperation. The invention can realize the interconnection of the intelligent certificate handling terminal and the background service equipment, cooperate to realize the seamless connection of the face-to-face meeting and the auditing link, and ensure that the whole business process and the result can comply with the law and be foolproof.
Owner:广州市华标科技发展有限公司

High water-consuming layer belt development oil reservoir layered water injection adjusting and controlling method

The invention relates to the field of oil-gas field development, in particular to a high water-consuming layer belt development oil reservoir layered water injection adjusting and controlling method which comprises the following steps: S1, collecting and tidying block geology and related development data; S2, applying the mathematical modeling analogy method to obtain a layered development index;S3, carrying out optimization on the water-consuming layer belt evaluation index to divide the level of the high water-consuming layer belt; S4, by combining with the development situation, screeningthe water injection adjusting and controlling horizon according to the level of the water-consuming layer belt to optimize the unit layered water injection; and S5, tidying the optimizing result to perfect the layered water injection adjusting and controlling scheme so as to carry out site implementation. According to the high water-consuming layer belt development oil reservoir layered water injection adjusting and controlling method, the level of the high water-consuming layer belt is distinguished and divided through the classifying coefficient of the high water-consuming layer belt; for different levels of the high water-consuming layer belt, the water flooding development index calculating method of the oil reservoir engineering theoretically established is combined with the optimal segmentation method theory, so that water consumption is reduced, and the economic life period of an oilfield is prolonged to finally realize the purpose of improving the oil reservoir recovery efficiency.
Owner:CHINA PETROLEUM & CHEM CORP +1

Multi-channel remote signal test device for ring network cabinet and test method thereof

The invention provides a multi-channel remote signal test device for a ring network cabinet and a test method thereof, and relates to the technical field of remote control signal test. The multi-channel remote signal test device for the ring network cabinet comprises an analog switch module A, an analog switch module 101, an analog switch module 102 and an analog switch module B. The multi-channel remote signal test method for the ring network cabinet comprises the steps of firstly, accessing a tester to the remote control loop of a ring network cabinet DTU; secondly, testing an initial state; thirdly, testing the state; fourthly, capturing and self-maintaining multi-channel remote signals; fifthly, recording a test result and checking the result. According to the invention, the device realizes the multi-channel test and four intervals can be continuously operated. Repeated confirming links are eliminated. Meanwhile, when one part inside the ring network cabinet or the switching-on outlet of the ring network cabinet is in wrong connection, the wrong connection can be directly reflected by the device. Therefore, the field test personnel can check and repair the wrong connection conveniently. Meanwhile, the wiring number is reduced through the standardized primary wiring operation by the device, so that the influence of human factors is reduced to the lowest.
Owner:XINING POWER SUPPLY CO OF STATE GRID QINGHAI ELECTRIC POWER CO +2

Layered strip mining method for gently inclined ore body

The invention relates to a layered strip mining method for a gently inclined ore body. According to the technical scheme, the mining method aims at the gently inclined ore body, and comprises the steps of ore block division and layout of stope preparation cutting, blasting, ventilation, mining and filling and transporting. The step of ore block division is that different panels are divided at eachstage, the panels are arranged along the ore body trend, a stage transportation roadway is excavated along the ore body trend, and the same number of ore rooms are divided on the left and right sideswith a floor rise in the middle of each panel as a boundary. Mining and filling have three steps that 1, ores in the upper layers of the ore rooms are stoped; 2, ores in the lower layers of the ore rooms are stoped; and 3, after the ore rooms are subjected to cemented filling, inter-columns in the panels are stoped, and the inter-columns are subjected to cemented filling after stoping. In the panels, the stoping of the step 1 and the stoping of the step 2 are sequentially conducted from top to bottom, and the principle of stoping every other ore room is strictly met; and after the mining of asingle ore room is completed, the approach road of the floor rise is closed, the ore rooms are filled by the approach road of a roof rise, after the ore rooms in a single panel are all mined and filled, the inter-columns in the panels are stoped, the mining mode is that mining is conducted from top to bottom, and filling is conducted after mining. The layered strip mining method has the characteristics that the mining cost is low, the ore stoping rate is high, and the mining efficiency is high.
Owner:WUHAN UNIV OF TECH

Method for selecting subinterval of near-infrared spectrum wavelength based on simulated annealing algorithm

The invention claims a method for selecting a subinterval of near-infrared spectrum wavelength based on a simulated annealing algorithm for analyzing the quality of farm products or foods, which comprises the following steps: performing pretreatment on the near-infrared spectrum and dividing the full spectrum of the near-infrared spectrum subjected to pretreatment into k subintervals; selecting the optimal number of characteristic subintervals and the combination mode thereof by using the simulated annealing algorithm, and then increasing the number of subintervals progressively; repeating the simulated annealing algorithm and then comparing the global optimal characteristic subinterval combinations obtained from the optimal characteristic subinterval combination in various interval division modes when finishing; and finally establishing a correction set model and a prediction set model. Apart from scientific and rational division of spectrum sub-intervals, the method has the advantages of ensuring the rapid convergence of algorithm, avoiding the problem that the algorithm only realizes the local optimal solution by judging the importance of the newly selected subinterval according to Metropolis rule, reducing the calculated amount for modeling, accelerating modeling and obtaining the high-quality near-infrared spectrum model quickly on the premise of obtaining the global optimal solution.
Owner:JIANGSU UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products