A sand-mudstone and fracture network technology, which is applied in the well layout field of fracture-network fracturing development, can solve the problems of high well pattern density, low single well productivity, and tight sand and mudstone reserves cannot be used economically and effectively, and achieve well pattern density The effect of reducing the size and saving the drilling cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Example 1 : Fracture-network fracturing of tight sand and mudstone reservoirs in Zhouzhou 602-4 well area
[0037] The Fuyang oil layer is developed in the sand body of this block, and the main layer is the FI1-7 layer, and the sand body is scattered on the plane, and the continuity is poor. Well layout according to the original rectangular well pattern water injection development method, as attached figure 1 As shown, the wells are arranged according to the 300m×100m well pattern, and a total of 26 wells need to be drilled.
[0038] The method of releasing wells by fracture network fracturing in tight sand and mudstone reservoirs is implemented as follows:
[0039] 1. Design of well row direction:
[0040] According to the electrical imaging logging analysis, it is determined that the maximum principal stress direction of the rock is 110 degrees northeast, so the direction of the well row is arranged according to this angle.
[0041] 2. Design of oil well spacin...
Embodiment 2
[0047] Example 2: Well release method for tight sand and mudstone reservoir fracture network fracturing development in Zhou 602-7 well area
[0048] The Fuyang oil layer is developed in the sand body of this block, and the main layer is the FI1-7 layer, and the sand body is scattered on the plane, and the continuity is poor. Well layout according to the original rectangular well pattern water injection development method, such as image 3 As shown, the wells are arranged according to the 300m×100m well pattern, and a total of 14 wells need to be drilled. The method of releasing wells by fracture network fracturing in tight sand and mudstone reservoirs is implemented as follows:
[0049] 1. Design of well row direction:
[0050] Firstly, according to the electrical imaging logging analysis, it is determined that the maximum principal stress direction of the rock is 90 degrees to the northeast, so the direction of the well row is arranged according to this angle.