Construction method for breaking and removing monolithic track bed in subway operation line tunnel
A construction method and technology in the tunnel, applied in the direction of roads, tracks, laying tracks, etc., to ensure the effect of the construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Refer to the attached picture, the construction method of removing the integral ballast bed in the tunnel of the railway operation line, and block the key points of construction in the tunnel of the subway operation line. The specific construction steps are as follows:
[0017] 1) Concrete demolition in the first stage: Use a high-frequency, low-noise wall saw to cut the concrete of the gutters on both sides longitudinally along the ballast bed on the outside of the sleepers, divide them into small pieces with a hand-held saw, chisel them out with electric picks and hydraulic picks, install The bag is transported outside, and the cutting depth is determined by using a special 4.3m long aluminum alloy ruler. According to the tunnel radius and tunnel convergence value, the vertical distance from the cutting surface to the ruler and the horizontal distance from the tunnel center are collected on site to determine the cutting depth;
[0018] 2) Remove the existing seamless l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com