A Method for Ecological Transformation of Hardened Ditch
An ecological and ditch technology, applied in the field of farmland environmental protection, can solve the problems of inability to absorb and adsorb, degrade nitrogen and phosphorus, low water and nutrient recycling rate, and shorten residence time of pollutant purification, so as to enhance ecological value and reduce rice field runoff load, the effect of enriching biodiversity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] A method for ecological transformation of a hardened ditch, comprising the following steps:
[0043] Step 1: Cleaning of hardened ditches and division of alternate construction areas of retaining wall type ecological ditch and floating type ecological ditch
[0044] Use tools to remove the weeds and silt around the wall of the hardened ditch 1, first divide a 200-meter-long wall-protected ecological ditch construction area on the cleaned ditch 1, and then leave a 100-m blank ditch, and then clean the ditch. On 1, a floating ecological ditch construction area of about 201m is divided;
[0045] Step 2: Installation of baseboard components and construction of spacers
[0046] Use the fixed bracket 2 to fix the clapboard 3 on both sides of the ditch 1 and the bottom of the ditch 1 in the construction area of the clapboard type ecological ditch. There is a distance of 0.25m between the clapboard and the walls of the two sides. Leave a distance of 0.4m from the bottom w...
Embodiment 2
[0061] A method for ecological transformation of a hardened ditch, comprising the following steps:
[0062] Step 1: Cleaning of hardened ditches and division of alternate construction areas of retaining wall type ecological ditch and floating type ecological ditch
[0063] Use tools to remove the weeds and silt around the wall of the hardened ditch 1, and first divide a 200-meter wall-protected ecological ditch construction area on the cleaned ditch 1, and then leave a 100-m blank ditch, and then clean the ditch. On 1, a floating ecological ditch construction area of about 201m is divided;
[0064] In step 1, a 100m blank ditch is left between the construction area of the retaining type ecological ditch and the construction area of the floating type ecological ditch, and the retaining type ecological ditch and the floating type ecological ditch are constructed alternately, and the blank ditch upstream of the floating type ecological ditch is set The aeration device 16, ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 