Construction project progress real-time control method based on BIM technology
A technology for project progress and real-time control, applied in instruments, data processing applications, calculations, etc., can solve problems that are not intuitive, affect project progress, and affect the communication and discussion of project participants, so as to improve work efficiency and reduce risks.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0014] The present invention is a kind of construction project progress real-time control method based on BIM technology, and it comprises:
[0015] 1) Collect BIM model information and progress information, and establish the correct correspondence between the model and the job; the correspondence is that a job corresponds to one or more BIM model components according to the content described in its name; if the detail level of the model components (LOD) is higher than the level of detail of the work in progress, then extract the corresponding model according to the level of detail of the work in progress; if the level of detail (LOD) of the model component is lower than The level determines the level of detail of the activities in the schedule and extracts the model corresponding to the activities.
[0016] 2) Input the BIM model information and progress information, link the BIM model components whose corresponding relationship has been determined with the work in progress a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com