A construction method of whole cylinder detachable waffle board
A construction method and technology of waffle boards, which are applied to floors, buildings, building components, etc., can solve the problems of difficult binding of steel bars at the bottom of the construction space, unfavorable construction progress and construction quality, and unfriendly indoor air, so as to eliminate the quality of steel bar binding Effects of non-conformity, material cost saving, VOC emission reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0022] The present invention is further illustrated by specific examples below.
[0023] A construction method for a detachable whole-tube waffle plate, comprising a waffle tube, wherein the waffle tube comprises five parts: a cylinder body, a cover plate, a top ring, a base, and a bottom ring; wherein, the base is arranged in the bottom ring , the bottom ring is arranged at the bottom of the barrel, the cover plate is arranged in the top ring, and the top ring is arranged on the top of the barrel; the construction method includes:
[0024] Step 1. Lay the waffle board floor formwork;
[0025] Step 2. Position and pay out the waffle tube;
[0026] Step 3. Install the base of the waffle cone and fix it with self-tapping screws;
[0027] Step 4, tie the steel bars;
[0028] Step 5. Install the bottom ring, the cylinder body and the top ring of the waffle cone in sequence and fix the installed waffle cone;
[0029] Step 6. Install the cover of the waffle cone
[0030] Step 7...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 