The invention relates to the field of factory building
constriction and particularly discloses a waferboard construction joint
mortar leakage prevention construction method. The waferboard construction joint
mortar leakage prevention construction method is characterized by comprising the steps that according to the construction joint position, a template is fixed to a plate template, and pouring is conducted through C30 fine aggregate concrete; the plate template is
cut apart, a
rebar is bound to fix the construction joint position; during concrete pouring, a high-pressure water gun is arranged, and splashed mud and leaked
mortar outside a construction joint are washed in time; and after waferboard pouring on one side of the construction joint, a closed net upper opening square
pipe is taken out, the condition of the upper opening concrete edge is inspected,
cutting trimming is conducted when necessary, a washing opening preset in the bottom plate template is sealed before pouring of secondary pouring side concrete, during sealing, joint filling is conducted through a template strip reserved during original
cutting, and then pouring of
secondary side concrete pouring is conducted. Through the waferboard construction joint mortar leakage prevention construction method, waferboard construction joint leakage prevention construction treatment can be conducted simply, effectively, fast and conveniently, and the formed concrete surface has the beautiful, flat and continuous effects.