Method of evaluating risk grade of new project crossing existing road facility
A technology of road facilities and risk levels, applied in the field of road engineering, can solve the problems of high dependence on subjective judgment and inaccurate division results.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] This method for evaluating the risk level of new construction crossing existing road facilities includes the following steps.
[0068] Step 1: Survey the pipeline 2 under the existing road facilities 1 and obtain the survey results; the survey content includes the type of pipeline and the diameter of the pipeline.
[0069] Step 2: Divide the existing road facilities 1 within the affected area of the crossing project 3 into three grades: particularly important, important and generally important according to their importance. The method of classification is as follows:
[0070] When the existing road facilities located within the impact area of the crossing project 3 are urban expressways and their affiliated bridges and tunnel facilities or expressways and their affiliated bridges and tunnel facilities, the importance level is particularly important;
[0071] When the existing road facilities located within the affected area of the crossing project 3 are urban trunk roads a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com