Method for acquiring terminal capability in dual-connection system

A technology of terminal capability and acquisition method, applied in the field of communication, can solve problems such as judgment, reduce handover interruption delay, achieve simple, effective, and strong operability effects

Active Publication Date: 2019-09-20
CHANGAN UNIV
View PDF9 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, since the frequency band combination in the capability information is not the complete set of frequency band combinations supported by the terminal, the terminal capability carried in the handover request may not include the frequency band combination of the target LTE cell and its secondary NR cell
At this time, the target LTE base station cannot judge whether the NR secondary cell should be configured for the terminal based on the terminal capability.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for acquiring terminal capability in dual-connection system
  • Method for acquiring terminal capability in dual-connection system
  • Method for acquiring terminal capability in dual-connection system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] Network architecture description: Base station 1 supports dual connectivity as the main LTE base station. The service frequency of serving cell 2 belongs to frequency band 3, and there is a different-frequency adjacent cell 4. The service frequency of this adjacent cell belongs to frequency band 5; The NR neighbor cell 6 of the standby secondary cell of the different system has a service frequency of frequency band 7; cell 4 has a different frequency neighbor cell 8, its service frequency belongs to frequency band 9, and has the same NR neighbor cell 6 as cell 2; 8. There is NR zone 10 as a backup secondary cell for different systems, and its service frequency belongs to frequency band 11; terminal A supports all EN-DC dual connectivity combinations of LTE frequency bands 3, 5, and 9 and NR frequency bands 7 and 11. The architecture diagram of this embodiment is shown in the attached image 3 .

[0026] The flowchart of this embodiment is attached Figure 4 , the proc...

Embodiment 2

[0036] Network architecture description: Base station 1 supports dual connectivity as the main LTE base station. The service frequency of serving cell 2 belongs to frequency band 3, and there is a different-frequency adjacent cell 4. The service frequency of this adjacent cell belongs to frequency band 5; serving cell 2 also serves as The NR neighbor cell 6 of the standby secondary cell of the different system has a service frequency of frequency band 7; cell 4 has a different-frequency neighbor cell 8, whose service frequency belongs to frequency band 9, and has the same NR neighbor cell 6 as cell 2; In 4, the secondary NR frequency bands 12 and 13 corresponding to the inter-frequency adjacent cell 8 are configured or obtained; cell 8 has NR areas 10 and 11 as inter-system backup secondary cells, and their service frequencies belong to frequency bands 12 and 13 respectively; terminal A All EN-DC dual connectivity combinations for LTE bands 3, 5, 9 and NR bands 7, 12, 13 are su...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for acquiring terminal capability in a dual-connection system. The method includes: when a user terminal needs to carry out intra-system pilot frequency switching, enabling the first main base station to judge whether the target frequency point is in a frequency band combination of the current user terminal capability information or not; if the target frequency point does not exist or the frequency band combination capability information corresponding to the target frequency point is not found, acquiring a user terminal capability message to obtain corresponding frequency band combination capability information; adding the frequency band combination capability information corresponding to the measurement report or the newly obtained target frequency point to the previous user terminal capability information, bringing the information to a second main base station in a switching request, and sending a reconfiguration message to a first main base station by the second main base station according to whether to configure inter-system measurement or configuration of an inter-system auxiliary cell; and enabling the user terminal to access the second main base station and the auxiliary cell through the reconfiguration message, and establishing double connections. According to the method, on the premise of not increasing the switching delay, the target base station can quickly obtain the frequency band combination, the operability is high, and the realization is simple and effective.

Description

technical field [0001] The present invention relates to the field of communication technology, in particular to a method for acquiring terminal capabilities in a dual connection system. Background technique [0002] With the development of electronic technology, a new generation of communication technology is constantly emerging. For operators, communication equipment based on the old generation of communication technology covers a wide range. It will take a certain amount of time for the new generation of communication equipment to gradually replace the old equipment. Therefore, In this process, there will be situations where old and new equipment provide services at the same time. In order to maximize the utilization rate of old and new equipment at the same time and improve user experience, a dual connection technology is invented and used in which the old equipment is used as the coverage layer and the new equipment is used as the capacity layer. For example, in the lat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04W24/10H04W36/00H04W36/22
CPCH04W24/10H04W36/0011H04W36/0083H04W36/22H04W36/0069
Inventor 徐先峰段晨东刘来君
Owner CHANGAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products