The invention discloses a
waste heat boiler dust deposition prevention device for an iron and steel
plant, and particularly relates to the technical field of
waste heat boiler dust deposition prevention devices. By arranging the multi-point
rapping structure, during use, multi-point simultaneous
rapping is adopted, firstly, in the aspect of applying
impact force to accumulated dust, multi-point simultaneous
rapping can act on the accumulated dust in multiple directions, the
impact force in multiple directions can generate extremely complex and diversified
stress distribution in the accumulated dust, the stress can break adhesion of accumulated
dust particles, and the
dust particles are prevented from being separated from the accumulated dust; the method comprises the following steps of: firstly, applying
impact force matched with the inherent frequency of an ash deposition structure to the vibration points at different positions on the vibration points on the
initiation of a
resonance phenomenon, more easily initiating
resonance, violently vibrating the ash deposition particles by the
resonance, and further generating a tensile force to separate the particles; the vibration points at different positions exert the impact force matched with the inherent frequency of the ash deposition structure; the
structural stability is weakened, so that particles are connected loosely and fall off, and accumulated dust finally falls off from a heated surface.