Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

137 results about "Full cycle" patented technology

In a pseudorandom number generator (PRNG), a full cycle or full period is the behavior of a PRNG over its set of valid states. In particular, a PRNG is said to have a full cycle if, for any valid seed state, the PRNG traverses every valid state before returning to the seed state, i.e., the period is equal to the cardinality of the state space.

Medical device systems implemented network scheme for remote patient management

A system and method for computer enabled network patient management of medical devices used in chronic disease management. Utilizing web site and push alert notification of alert level physiologic data derived via analysis of continuous stream wireless data transmissions from a patient, a full cycle improvement over existing modalities is achieved. Proxy and medical device user integration and access is enabled to achieve further contribution to the technical advantages of the system.
Owner:MEDTRONIC INC

CMOS TDI image sensor

A column slice of a CMOS TDI sensor includes a column bus, a column of pixels, plural first switches, a column of accumulators, plural second switches, plural third switches and output bus 39. Each of the plural first switches is coupled between the column bus and a corresponding pixel of the column of pixels, and each of the plural second switches is coupled between the column bus and a corresponding accumulator of the column of accumulators. In operation, only one switch at a time of plural first switches is “on” to connect the voltage signal from a corresponding pixel to the column bus while all remaining plural first switches are “off” to isolate the column bus from all remaining pixels. Only one of the plural second switches is “on” to connect the signal on the column bus to an accumulator while all remaining plural second switches are “off” to isolate the bus from all remaining accumulators. A main control circuit includes first and second shift registers to control the plural first and second switches to couple a signal from each pixel of the column of pixels into a corresponding accumulator of the column of accumulators while updating the accumulator until signals from all pixels have been transferred into corresponding accumulators. After this update cycle, an accumulated signal from the one accumulator that is currently addressed by a third shift register is read to the output. Then, the first and third shift registers are incremented. A new update cycle begins when a point in a moving image focused on the column slice crosses a pixel boundary. The same pattern repeats continuously. Valid TDI data is produced at the output after a number of full cycles of the transfer of pixels signals to the accumulators has been complete, the number being equal to the number of pixels.
Owner:TELEDYNE DIGITAL IMAGING INC

Trajectory data-based signal intersection periodic flow estimation method

The invention relates to a trajectory data-based signal intersection periodic flow estimation method. The method comprises the following steps that: 1) the trajectory point data of sampled vehicles are acquired, and the key point information of the vehicles entering and leaving a queue is obtained; 2) a fitting method is adopted to estimate the queuing waves and evanescent waves of vehicle queuing, and the intersection point of the queuing waves and the evanescent waves is taken as the flow estimated value of queuing vehicles; 3) the density distribution function of full-cycle flow is obtainedaccording to the flow estimated value, and the proportion of non-stop vehicles in the full-cycle flow; and 4) a full-cycle flow estimation problem is transformed into a parameter estimation problem based on the Poisson distribution and M3 distribution of the non-queuing vehicles according to the density distribution function of the full-cycle flow, and a maximum likelihood estimation method is used to perform estimation, and the maximum-likelihood expectation-maximization method is adopted to perform solving, and the estimated value of the arrival flow of each cycle can be obtained. Comparedwith the prior art, the method of the present invention has the advantages of the fusion of model analysis and statistical analysis, the full use of trajectory information, wide applicability and thelike.
Owner:TONGJI UNIV

Control method for manufacturing process of key parts of marine diesel engine based on digital twin

ActiveCN109270899AMonitor Disturbance FactorsDisturbing factors are eliminated in timeTotal factory controlProgramme total factory controlInformation spaceFull cycle
The invention discloses a control method for the manufacturing process of key parts of a marine diesel engine based on digital twin. The method comprises the following steps: (1) creating a manufacturing service platform for the key parts; (2) performing real-time data acquisition; (3) establishing a digital twin model system; (4) performing quality prediction; and (5) performing synchronous execution and control of the manufacturing process. Through quality control for key part manufacturing of the marine diesel engine, the quality data of workpiece processing and manufacturing based on a digital twin technology can be monitored dynamically and visually in real time. Process parameters are optimized by real-time simulation of a digital twin model, and an actual processing process is controlled with optimized parameters. Meanwhile, real mapping of an information space and a physical space is utilized effectively, and real-time and full-cycle management and control of the quality of thekey parts and the stability of processing resources and equipment in the manufacturing process are realized. The method is of great significance to improve the quality of the key parts and the utilization rate of resources, as well as to improve the production efficiency.
Owner:JIANGSU UNIV OF SCI & TECH

Automated meter reader

A meter reader for reading a meter have a display portion displaying a total output of a quantity being metered and plural incremental outputs defining the total output. The meter reader includes a sensing mechanism for sensing one of the plural incremental outputs in the meter display portion, and a processing unit coupled to the sensing mechanism for accumulating incremental outputs sensed by the sensing mechanism and for determining accumulated meter output over a time period based on the accumulated incremental outputs. Also included is an output mechanism for outputting the accumulated meter output determined by the processing unit. In one example, the sensing mechanism includes a sensor for sensing only a least significant incremental output in usage included in the meter display portion, and an emitter for illuminating the least significant incremental output included in the meter display portion. Further, the sensing mechanism senses the least significant incremental output included in the meter display portion at least once every full cycle of the least significant incremental output.
Owner:SENSUS SPECTRUM LLC

Method and apparatus for controlling power to a heater element using dual pulse width modulation control

A method for controlling power to an electrical load using dual pulse width modulation (PWM) to minimize in-rush current to the electrical load, such as a heater element. An output from a power source, supplying an alternating current, is modulated by a first PWM control signal to provide a first modulated power level to the electrical load. The first modulated power level is modulated by a second PWM control signal to control power supplied to the electrical load at the first modulated power level. The first PWM control signal operates to control the number of half cycles of current in order to provide one-third, two-thirds or full cycle power. The second PWM control signal operates to define a duty cycle and period for providing the power defined by the first PWM control signal to the electrical load.
Owner:LEXMARK INT INC

System, method and computer product for implementing a 360 degree critical evaluator

InactiveUS20090089154A1Facilitates systematic acquisition and assessmentImprove performanceInstrumentsFull cycleEmployee Performance Appraisal
A web-based full-cycle 360 degree (manager, peer and employee feedback) employee performance evaluation and management system and method based on organization-defined standards of behavior, job specific criteria, self review, peer feedback, and dotted line supervisor input. Standardizes evaluations for shared efforts and matrix type management situations. Evaluations include all aspects of the evaluated requirements in the employee assessment such as: job knowledge, accomplishment of objectives, quality of work, productivity, initiative and creativity, interpersonal relationships, supervisory skills, dependability and professional contribution. Manages delivery and tracking of employee performance and identifies educational and professional development needs. Provides a comprehensive record of skills and abilities that could benefit the organization and might otherwise not be noticed or recognized. Assembles data to assist with planning personnel moves and placements that will best utilize each employee's demonstrated capabilities. Customizable template-based evaluation layouts facilitate review entry forms and final printed format that matches an organization's standards of presentation. Manages performance consistency with trend analysis and out-of-bound exception reporting. Evaluates organizational performance on measured standards of excellence and environment. Delivers automated email reminders to staff and managers about pending evaluations. Provides for summary record of compliance for accreditation and certification agencies.
Owner:DION KENNETH W

Power transformer asset management device and method therefor

ActiveUS20190392360A1Maximize physical performanceEconomic value maximizationElectric testing/monitoringResourcesFull cycleHealth index
The present invention relates to a power transformer asset management device and a method thereof, the device according to the present invention including: a full cycle database managing full cycle data of a power transformer; a physical performance evaluation unit performing physical performance evaluation that calculates a health index by analyzing and weighting life information, a failure ratio, operation history, and status information of a preventive diagnosis system from the full cycle data; a risk evaluation unit performing risk evaluation by generating a risk matrix using the physical performance evaluation result; an economic evaluation unit performing economic evaluation by evaluating costs over a full cycle of the power transformer; and an asset management unit establishing an investment plan for replacing the power transformer according to a maintenance priority of the power transformer determined using the physical performance evaluation result, the risk evaluation result, and the economic evaluation result.
Owner:KOREA ELECTRIC POWER CORP

Arc fault detector responsive to patterns in interval to interval change in integrated sensed current values

The arc fault detector analyzes the pattern in the sequence of counts of increasing or decreasing intervals in the integrated current for patterns characteristic of an arc fault. In an AC system, the interval may be a full cycle, or, in an alternative embodiment, the positive and negative half-cycle integrated current changes are determined separately and then interleaved before calculating the change count. When a pattern characteristic of a phenomenon other than an arc fault is detected, the counting sequence is reset in order to avoid nuisance tripping.
Owner:EATON CORP

Method and device for tracking global positioning system precision (GPS P) and/or Y code signal of full-cycle carrier

ActiveCN102116866AThere is no half-wavelength ambiguitySupport trackingSatellite radio beaconingFull cycleSignal-to-noise ratio (imaging)
The invention provides a method and a device for tracking a global positioning system precision (GPS P) and / or Y code signal of a full-cycle carrier. The method comprises the following steps of: generating a local P code through coarse / acquisition (C / A) code guide of an L1 satellite signal; correlating the L1 satellite signal and an L2 satellite signal to the local P code respectively; performingprimary accumulation with W bit length on the correlation result, multiplying in a crossed way, and then performing secondary accumulation to obtain secondary accumulation results of the L1 satellitesignal and the L2 satellite signal respectively; and tracking a code ring and a carrier ring of the L1 satellite signal and the L2 satellite signal according to the secondary accumulation results of the L1 satellite signal and the L2 satellite signal. By the method and the device, full-wavelength restoration of the carrier can be realized on the L2; and higher signal-to-noise ratio is achieved.
Owner:UNICORE COMM INC

Full cycle visual SLAM algorithm using CNNs feature detection

The invention discloses a full-cycle visual SLAM algorithm using CNNs feature detection. First, in the front end, the original image data is pre-trained by an unsupervised model, and then the pre-trained data is used through CNN network architecture to correlate the joint representation of motion and depth with the changes in local velocity and direction, thus executing the visual odometry. Finally, the path prediction is performed. The invention also uses the OverFeat neural network model for loop detection to eliminate the accumulated errors caused by the front end and constructs a visual SLAM architecture based on deep learning. At the same time, a time and space continuity filter is constructed to verify the matching results, improve the matching accuracy and eliminate mismatching. Theinvention has tremendous advantages and potentials in improving the accuracy of visual odometry and the correct rate of closed-loop detection.
Owner:BEIHANG UNIV

Method and apparatus for synchronizing data in utility system

A time synchronization device (TSD) that produces a synchronization signal and couples it onto energized power conductors in a power monitoring system. Monitoring devices coupled to the TSD include frequency detection algorithms, such as a Goertzel filter, for detecting the synchronization signal and interpreting the information encoded in the signal. The frequency of the synchronization signal may correspond to the fourth or tenth harmonic component of the fundamental frequency of the voltage on the power conductors. The magnitude of the signal is selected to be above the expected or established noise floor of the power monitoring system plus a predetermined threshold. The duration of the signal can be varied, such as lasting a full cycle of the fundamental frequency. Multiple TSD signals received in a predetermined sequence may be converted into digital words that convey time, configuration, reset, control, or other information to the monitoring device.
Owner:SCHNEIDER ELECTRIC USA INC

GNSS precise positioning method based on multi-dimensional particle filter deviation estimation

The invention discloses a GNSS precise positioning method based on multi-dimensional particle filter deviation estimation. The method comprises: step one, carrying out data pretreatment and inputtinga satellite ephemeris, a current epoch pseudo-range observation value, and a current epoch phase observation value; step two, building a GNSS double-difference observation equation and carrying out linearization to obtain a single epoch normal equation or an epoch-accumulation normal equation; step three, calculating the normal equation by using a corresponding offset in a particle correction normal equation with multiple particle values; updating a particle filter weight and calculating a numerical value of a fractional part of the offset between the phase systems and a particle mean square root based on the weighted particle; step four, repeating the steps one to three, outputting a corresponding offset estimation value and a corresponding variance after filter convergence; and step five, according to an estimation value of an error parameter, correcting the offset value in the observation value or the normal equation and fixing a full-cycle fuzziness value to realize precise positioning. With the method disclosed by the invention, simultaneous estimation of multiple GNSS offset parameters by particle filtering is realized and precise relative positioning is realized by using a few of observation satellites.
Owner:SOUTHWEST JIAOTONG UNIV

Computation method of differential filter weighting period small amplitude value

InactiveCN101329374ACalculation result error is smallFilter out attenuated DC componentsSpectral/fourier analysisFull cycleUltrasound attenuation
The invention provides a calculation method of a filter-divider plus full-cycle Morlet complex wavelet amplitude, comprising the steps: (1) supplying power on a micro-computer protection device; (2) giving an initial value to k, frequency width adjusting coefficient c and a sampling point number N to the periodic signal of electric elements in a period; (3) working out the proportion coefficient Tau according to an Morlet complex wavelet discrete expression: Psi(n) equals to Tau multiplied by exp[-(6n / N-3)<2> / c] multiplied by exp(j2pikn / N) and a formula: Tau equals to N / Sigma|Psi(n) / Tau|n; wherein, n equals to 1, 2, ellipsis, N minus 1; (4) calculating the real par of Morlet complex wavelet according to a formula: Psi<R>(n) equals to Tau multiplied by exp[-(6n / N-3)<2> / c] multiplied by cos(2pikn / N); (5) calculating the virtual part of the Morlet complex wavelet according to a formula: Psi(n) equals to Tau multiplied by exp[-(6n / N-3)<2> / c] multiplied by sin(2pikn / N); (6) taking f(s) as sampling frequency so as to obtain the discrete sequence f(n) of the periodic signal of the electric element in a period; wherein, f<s> is equal to N multiplied by f; and f is the fundamental frequency of the periodic signal; (7) obtaining the discrete sequence g(n) according to a differential filter equation: g(n) equals to f(n) minus f(n minus N / 2); (8) Calculating the amplitude according to a formula: Fk(n) equals to (g(n) Psi<R>(n)<2> plus g(n) Psi<1>(n))<2>. The method provided by the invention can filter the attenuation DC component and has small calculation result error when the power network frequency fluctuates.
Owner:HARBIN INST OF TECH

Modeling full and half cycle clock variability

A modeling system includes a processor with software that performs static timing analysis (STA) on a design model. STA software executes a static timing analysis (STA) run with shortened clock cycles to model full cycle clock variability. Designers or other entities interpret the results of the shortened STA run data by performing modeling on the output data to generate slack data for design model data paths. STA software executes an STA run with an extended clock cycle to automatically separate half cycle data path (HCDP) slack data from full cycle data path (FCDP) slack data. The full and half cycle clock variability method may automatically adjust slack data for all half cycle data paths (HCDP)s to account for the additional half cycle variation (AHCV) and half cycle clock edge variability that may penalize the design model results in a real hardware implementation. Designers use a sort of slack data for half cycle data paths (HCDP)s independent of the slack data for the full cycle data path (FCDP)s to modify or otherwise perform design changes to the design model prior to hardware implementation.
Owner:IBM CORP

Arc fault detector responsive to patterns in interval to interval change in integrated sensed current values

An arc fault detector analyzes patterns in a sequence of counts of interval to interval increases or decreases in integrated current for patterns characteristic of arc faults. In AC systems, the interval can be a full cycle or in an alternative embodiment, the changes in integrated current for positive and negative half cycles are separately determined and then interleaved before the change counts are calculated. The count sequence is reset when patterns characteristic of phenomena other than an arc fault are detected to avoid nuisance trips.
Owner:EATON INTELLIGENT POWER LTD

Wireless data and power transfer over an inductive telemetry link

A telemetry device includes a resonant inductive link with a primary LC tank and secondary LC tank configured to resonate at a carrier frequency. A modulator assembly in communication with the secondary LC tank implements data-synchronized cyclic on-off keying modulation (COOK) to periodically create a short across the secondary LC tank in response to a pulse from a phase selector and phase-locked loop. During the full cycle-length of the short, data can be transmitted across the inductive link while the charge across the secondary LC tank is preserved. Power may be transferred across the link during non-shorted cycles.
Owner:RGT UNIV OF CALIFORNIA

System and method for power line communications

A communication system for a power line is described. A transmission system of the communication system divides the time axis into a number of time slots synchronized such that one time slot can start about a zero crossing of the power line signal. These time slots are referred to as channels and are numbered from 1 to n. A modulation method is described to is narrow band continuous phase FSK, where a number m of modulating frequencies are used, arranged such that an integral number of full cycles fit into each channel time slot for all m frequencies. The system transmits during only a subset of the available time slots (channels) concentrated near the zero crossing of the power line waveform where the noise is typically minimal.
Owner:ANALOG DEVICES INC

Methods and apparatus for measuring the fundamental frequency of a line signal

The present invention provides methods, apparatus, and systems of measuring frequency. The invention includes sampling a first number of full cycles of a signal at a rate based on a nominal frequency of the signal; converting the samples to digital samples; processing the digital samples to identify a first pair of digital samples with each one disposed on either side of a first zero-crossing and a second pair of digital samples with each one disposed on either side of a last full cycle zero-crossing; interpolating the first pair of digital samples and the second pair of digital samples to determine a position of the first and last zero-crossings relative to each other in time; and calculating a fundamental frequency of the signal based on the first number of full cycles sampled and the relative position of the first and last zero-crossings. Numerous additional aspects are disclosed.
Owner:SIEMENS IND INC

Particle-filtering-based real-time tracking and precise estimation method of phase inter-system bias of GNSS

The invention discloses a particle-filtering-based real-time tracking and precise estimation method of a phase inter-system bias of a GNSS. The method comprises: step one, data preprocessing is carried out and a satellite ephemeris value, a current epoch pseudo-range observation value and a current epoch phase observation value are inputted; step two, intra-system and inter-system observation value equations are established and linearization is carried out to obtain a single-epoch normal equation or an epoch-accumulative normal equation; step three, a GNSS observation value normal equation inter-system bias is corrected, the normal equation is calculated and a particle filter weight is updated, and according to a weighted particle, a numerical value of a fractional part of a phase inter-system bias and a particle mean square root are calculated; and step four, the previous three steps are repeated, the value of the fractional part of the phase inter-system bias of the GNSS is tracked in real time to realize real-time tracking; or the previous three steps are repeated, a phase inter-system bias value is estimated precisely and the intra-system and inter-system double-different full-cycle fuzziness values are fixed to realize precise positioning. Therefore, real-time tracking and precise estimation of the phase inter-system bias of the GNSS are realized efficiently; and indistinctive multi-mode GNSS precise positioning of the system is realized.
Owner:SOUTHWEST JIAOTONG UNIV

Optimization method with parallel computations

Optimization method with parallel computations, including performing multiple stages of calculating target function of P independent parameters using GPUs, wherein entire one-dimensional array of the calculated values of the target function of length∏j=1P⁢Wjthat needs to be computed is divided into groups of size η and calculated in parallel atL=∏j=1η⁢Wjη parameter points; a number of simultaneously calculated parameters η in each group and a number of calculation points Wj of the target function at interval Dj for each j-th desired parameter in the group is selected based on a possible number of parallel calculations R=G·M·T, where G is number of GPUs, M is number of cores in each GPU, T is number of threads in each core; and outputting the calculated P parameters for the global extremum of the target function, wherein a full cycle of calculating points is carried out for consecutive iterations, defined as integer division⌈LR⌉,rounding up.
Owner:BELL INTEGRATOR INC

Signal processing using non-linear regression with a sinusoidal model

A method for processing signals, such as a tomography signal, in the time domain provides both high spatial resolution and high frequency resolution but at low cost. The method uses non-linear regression with a sinusoidal model to fit a sine wave to a portion of the signal that is less than a full cycle of a wave of the signal.
Owner:NORTHWESTERN UNIV

Electric-gas distribution network flexible planning method considering flexible constraint and full cycle cost

The invention discloses an electric-gas distribution network flexible planning method considering a flexible constraint and full cycle cost. The method comprises the following steps of 1) establishingan electric-gas distribution network typical planning model based on CCHP coupling, which includes establishing a target function and a constraint condition; 2) introducing flexible planning elements, which includes a flexible power flow constraint and full-cycle planning cost; and 3) forming a flexible planning model and solving, which includes flexible planning model description and call MOSEKsolution. A CCHP-coupled electric-gas distribution network power flow model based on a second-order cone model is established. In the model, non-convex and nonlinear terms in a traditional power flowequation are eliminated and effective solution can be performed while calculation accuracy is ensured. For various uncertainties in planning, the concept of the flexible constraint is introduced intothe planning model, which improves the robust adaptability of a planning scheme to various uncertain factors.
Owner:HUANAN IND TECH RES INST OF ZHEJIANG UNIV +1

Quick and nondestructive testing method for road axle load spectrum

The invention discloses a quick and nondestructive testing method for a road axle load spectrum, wherein the method belongs to the field of road engineering prospection and design. The quick and nondestructive testing method is a full-section axle load spectrum which is performed without traffic interception. Furthermore representative traffic load sample data are acquired, thereby supplying traffic load data which accord with an actual traffic load condition for road surface maintenance design and preventative maintenance decision. Compared with the prior art, the quick and nondestructive testing method for the road axle load spectrum has advantages of high mounting speed, no pavement damage, high movement flexibility, effective recyclability, etc. The quick and nondestructive testing method can be used for performing axle load investigation on a designed road, thereby obtaining an actual driving load, truly reflecting pavement load condition of the road, and supplying reliable design basis for road engineering design. Furthermore the quick and nondestructive testing method has important function and meaning on prolonging service life of the pavement structure, reducing full-cycle cost of the road and promoting environment-friendly traffic transportation construction.
Owner:韦金城 +2

Differential protection method for preventing abnormally great number of sampling values

The invention provides a differential protection method for preventing abnormally great number of sampling values. The differential protection method includes steps of starting sudden change of current or current effective value when abnormally great number of sampling values of a device to be protected is generated; after starting protection, waiting for a cycle of data, and starting allowance criteria if the abnormally great number of the sampling values in one cycle is continuously or intermittently generated and data calculated by full-cycle Fourier algorithm satisfy action criteria. The differential protection method is applicable to various differential protections such as differential protection of transformer and other quick-break actions, and the problem that misoperation of the protection device is caused by abnormalities of the sampling value of a data acquisition system of the protection device when electromagnetic interference occurs at the mounting position of the protection device or hardware of the protection device is abnormal is avoided.
Owner:北京天能继保电力科技有限公司

High-efficiency data center cloud server resource autonomous management method and system

The invention provides a high-efficiency data center server resource autonomous control method and system, and belongs to the field of computer high-performance computing. The system comprises a resource real-time scheduling layer, wherein the resource real-time scheduling layer comprises a performance monitor, an online estimator A, a resource controller and a resource distributor, the energy consumption control layer comprises a performance monitor, an online estimator B, an energy consumption controller and a frequency regulator, and the virtual machine migration layer comprises a performance monitor, a load detector and a virtual machine migration scheduler. The method comprises three parts, namely real-time resource scheduling, energy consumption control and virtual machine migration,which are respectively and correspondingly cooperatively operated on second-level, minute-level and hour-level levels, so that the data center server achieves optimal control of performance and energy consumption. According to the method and the system, the full-cycle multi-level cloud resource scheduling management of the data center server can be realized, the energy consumption of the data center server is greatly reduced, and the cloud service quality is ensured.
Owner:CHONGQING INST OF GREEN & INTELLIGENT TECH CHINESE ACADEMY OF SCI

System and method for tracking engine cycles

A system and method for detecting / calculating engine cycles, tracking engine cycles and correlating the engine cycles to parts to measure accumulated cycles associated with the parts. A system is disclosed that includes a parts tracking system for tracking serialized parts contained within the machine; an interface for importing cycles data on the machine via a remote data collection unit, wherein the cycles data includes full cycle, partial cycle, and trip cycle data; and a cycles calculation system for calculating accumulated cycles for each of the serialized parts contained within the machine based on the imported cycles data.
Owner:STRATEGIC POWER SYST

System and method for tracking engine cycles

A system and method for detecting / calculating engine cycles, tracking engine cycles and correlating the engine cycles to parts to measure accumulated cycles associated with the parts. A system is disclosed that includes a parts tracking system for tracking serialized parts contained within the machine; an interface for importing cycles data on the machine via a remote data collection unit, wherein the cycles data includes full cycle, partial cycle, and trip cycle data; and a cycles calculation system for calculating accumulated cycles for each of the serialized parts contained within the machine based on the imported cycles data.
Owner:STRATEGIC POWER SYST

Full-cycle or half-cycle synchronous frequency measurement corrected digital demodulation detection system and detection method of amplitude-modulated signals

The invention relates to a full-cycle or half-cycle synchronous frequency measurement corrected digital demodulation detection system and detection method of amplitude-modulated signals. The full-cycle or half-cycle synchronous frequency measurement corrected digital demodulation detection system and method can be adopted to realize the amplitude detection of the amplitude-modulated signals. According to the detection system, a micro controller unit is adopted to control a high-speed analog-to-digital conversion unit to perform signal acquisition, and lock-in amplified digital integral and filtering can be realized through absolute value cumulative averaging calculation; and the starting point of a full cycle or a half cycle is captured, and the frequency of the signals is measured through using high-frequency counting, and frequency correction is performed on a detection result. Compared with an existing detection system using a lock-in amplifying circuit, the detection system of the invention has the advantages of simple circuits, no middle debugging process and high detecting precision; compared with an existing simplified digital demodulation detection system, the detection system of the invention can assist in decreasing system detection noise and improving detection accuracy under the premise that the complexity of the circuits and algorithms as well as detection time and cost are not increased.
Owner:JILIN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products