Suspended construction platform for a bridge
A technology for construction platforms and bridges, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc. It can solve the problems of increasing work intensity, time-consuming and labor-intensive, easy to hurt passing vehicles or pedestrians, etc., and achieve the effect of convenient development
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] refer to Figure 1-5, a suspended construction platform for a bridge, comprising a fixed plate 1 and a construction platform body 2, the bottom of the fixed plate 1 is fixedly connected to the top of the construction platform body 2, a motor room 8 is provided on the top of the fixed plate 1, and the motor room 8 is fixed A motor 3 is installed, a construction window is provided on one side of the construction platform body 2, and a first chute 4 is provided on one side inner wall of the construction platform body 2, and a second sliding slot is provided on the other side inner wall of the construction platform body 2. Slot 5, the first chute 4 and the second chute 5 are slidably installed with the same lifting platform 6, the top inner wall and the bottom inner wall of the second chute 5 are provided with first rotation holes, and the two first rotation The same threaded rod 7 is rotated in the holes, and one side of the lifting platform 6 is provided with a threaded h...
Embodiment 2
[0040] refer to Figure 1-5 , a suspended construction platform for a bridge, comprising a fixed plate 1 and a construction platform body 2, the bottom of the fixed plate 1 is fixedly connected to the top of the construction platform body 2 by welding, the top of the fixed plate 1 is provided with a motor room 8, and the motor room 8 A motor 3 is fixed inside by bolts, a construction window is provided on one side of the construction platform body 2, and a first chute 4 is provided on one side inner wall of the construction platform body 2, and a first chute 4 is provided on the other side inner wall of the construction platform body 2. There is a second chute 5, the first chute 4 and the second chute 5 are slidingly installed with the same lifting platform 6, the top inner wall and the bottom inner wall of the second chute 5 are provided with a first rotation hole, two The same threaded rod 7 is rotated in each first rotating hole, and one side of the lifting platform 6 is pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com