Construction method of basement shear wall and formed structure thereof
A construction method and shear wall technology, applied to underwater structures, foundation structure engineering, walls, etc., can solve problems such as difficulties in concrete pouring of shear walls
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0035] The present invention adopts a construction method of a basement shear wall, by reserving a through hole on the roof corresponding to the position where the shear wall is to be formed, and then pouring concrete into the pouring space through the through hole to form the shear wall. The pouring through the through hole solves the problem of difficult concrete pouring of the shear wall, which can make the poured concrete dense, ensure the quality of the project, and realize the advanced construction of the underground structure. Below in conjunction with accompanying drawing, the construction method of basement shear wall of the present invention is described.
[0036] refer to figure 1 , figure 1 It is an overall sectional view of the construction method of the basement shear wall of the present invention. Combine below figure 1 , the...
PUM