Real-time traffic early warning management and control method and system for mountainous city hot spot area

A hotspot area and real-time traffic technology, applied in traffic control system, traffic control system of road vehicles, traffic flow detection, etc., can solve the problems of large traffic flow, deterioration and shortage of related road traffic operation conditions, and improve management and control efficiency , the effect of relieving traffic pressure

Active Publication Date: 2020-11-13
CHONGQING JIAOTONG UNIVERSITY
View PDF9 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The spatial form of mountainous cities presents a "multi-center" and "multi-cluster" pattern, with heavy traffic flow and significant road bottlenecks, which makes it more difficult to control hotspot areas and invisibly increases social and economic losses and environmental pollution. In the field of road traffic control, most of the control methods rely on previous traffic control experience and adopt a "one-size-fits-all" control method. Although the pressure on road traffic operations in hotspot areas is relieved to a certain extent, the lack of traffic data support and scientific control methods has led to surrounding areas being trafficked. Strictly controlled related road traffic operation situation has deteriorated sharply

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time traffic early warning management and control method and system for mountainous city hot spot area
  • Real-time traffic early warning management and control method and system for mountainous city hot spot area
  • Real-time traffic early warning management and control method and system for mountainous city hot spot area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The principles and features of the present invention are described below in conjunction with the accompanying drawings, and the given embodiments are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0037] Such as figure 1 As shown, the present invention provides a schematic flow diagram of a real-time traffic early warning and control method embodiment in a mountainous city hotspot area, including:

[0038] Step 1. Obtain mountain city traffic data;

[0039] Step 2. Determine the number of vehicles on the network and the congestion delay index according to the data;

[0040] Step 3. Carry out early warning according to the number of vehicles on the network and the congestion delay index during the time period;

[0041] Step 4, according to the level of early warning, input the congestion delay index corresponding to the level into the relationship model between the congestion delay index and the number of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a real-time traffic early warning management and control method for a mountainous city hot spot area. The method comprises the steps of 1, obtaining traffic data of a mountainous city; 2, determining the number of vehicles in the network and a congestion delay index in a time period according to the data; 3, carrying out early warning according to the number of vehicles inthe network and the congestion delay index in the time period; 4, according to the early warning level, inputting the congestion delay index into a relation model of the congestion delay index and thenumber of vehicles in the network at a moment; and 5, determining actual control flow according to an output result of the relation model. According to the real-time traffic early warning managementand control method, stable and controllable flow of a key area and flow balance of an associated road network are ensured, traffic operation pressure of a mountainous city hot spot area and a surrounding road network is relieved, early warning processing can be carried out, and the management and control efficiency can be improved.

Description

technical field [0001] The present invention relates to the field of traffic management and control, in particular to a method and system for real-time traffic early warning management and control in hotspot areas of mountainous cities. Background technique [0002] The spatial form of mountainous cities presents a "multi-center" and "multi-cluster" pattern, with heavy traffic flow and significant road bottlenecks, which makes it more difficult to control hotspot areas and invisibly increases social and economic losses and environmental pollution. In the field of road traffic control, most of the control methods rely on previous traffic control experience and adopt a "one-size-fits-all" control method. Although the pressure on road traffic operations in hotspot areas is relieved to a certain extent, the lack of traffic data support and scientific control methods has led to surrounding areas being trafficked. The traffic situation of the strictly controlled related roads has ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & AuthorityApplications(China)
IPC IPC(8): G08G1/01
CPCG08G1/0104G08G1/0137
Inventor蔡晓禹郭斌田东张继先钟添翼王世彬闫建华吴月余诵张钟张有节张礼宁
OwnerCHONGQING JIAOTONG UNIVERSITY