A technology for an integrated energy system and design scheme, which is applied in the field of the generation method and system of an integrated design scheme for an integrated energy system in a park, and can solve problems such as difficulty in optimal design, difficulty in obtaining an optimal scheme, and difficulty in collecting building load data.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] This embodiment provides a method for generating an integrated design scheme of the park's comprehensive energy system;
[0035] Such as figure 1 As shown, the generation method of the integrated design scheme of the comprehensive energy system of the park includes:
[0036] S101: Obtain the basic information of each building in the park; obtain the annual load data of each building in the park according to the basic information of each building in the park;
[0037] S102: Input the annual load data of all buildings in the park into the optimization design model, and establish a three-layer nested optimization design model;
[0038] S103: The optimization objectives of the three-layer nested optimization design models are the same, and different optimization algorithms are used to solve the nested optimization design models of each layer, and the iterations are repeated until the optimal planning and design scheme of the comprehensive energy system of the park is obtai...
Embodiment 2
[0135] This embodiment provides a system for generating integrated design schemes of park comprehensive energy systems;
[0136] The generation system for the integrated design scheme of the comprehensive energy system of the park, including:
[0137] The obtaining module is configured to: obtain the basic information of each building in the park; obtain the annual load data of each building in the park according to the basic information of each building in the park;
[0138] The model building module is configured to: input the annual load data of all buildings in the park into the optimal design model, and establish a three-layer nested optimal design model;
[0139] The scheme generation module is configured as follows: the optimization objectives of the three-layer nested optimization design model are the same, and different optimization algorithms are used to solve the nested optimization design model of each layer, and iteratively iterates until the optimal comprehensive...
Embodiment 3
[0144] This embodiment also provides an electronic device, including: one or more processors, one or more memories, and one or more computer programs; wherein, the processor is connected to the memory, and the one or more computer programs are programmed Stored in the memory, when the electronic device is running, the processor executes one or more computer programs stored in the memory, so that the electronic device executes the method described in Embodiment 1 above.
[0145] It should be understood that in this embodiment, the processor can be a central processing unit CPU, and the processor can also be other general-purpose processors, digital signal processors DSP, application specific integrated circuits ASIC, off-the-shelf programmable gate array FPGA or other programmable logic devices , discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor, or the processor may be any conventional processor, o...