A curtain grouting method
A curtain grouting and grouting technology, used in construction, building maintenance, building construction, etc., can solve problems such as large consumption of materials, and achieve the effect of improving the working environment and avoiding getting wet
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0054] This embodiment provides a curtain grouting method. The working conditions of applying the method are basement concrete side walls, the concrete thickness is 50cm, and there is a small amount of water inflow. The method includes the following steps:
[0055] S1: Adjust and determine the gel time of the acrylate slurry to be 28-32 sec by adjusting the amount of initiator and cross-linking agent added in the acrylate slurry.
[0056] S2: Use an impact drill to drill holes on the backwater surface of the concrete wall to a depth of 48-49cm, use a steel bar with a diameter of 10mm to penetrate the inside of the drill hole, and hit the steel bar with a hammer to the depth of the undrilled hole. The concrete wall of 1-2 cm produces cracks; the drill holes are multiple, and the hole spacing between each drill hole is 1.5m, and the points are arranged in a plum blossom shape, and the drill bit of the impact drill is 16mm in diameter and 600mm in length.
[0057] S3: Place a PVC...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


