Working platform task management and control method based on progress tracking

A work platform and task management and control technology, applied in the direction of instruments, data processing applications, resources, etc., can solve problems such as inability to track task progress, and achieve the effect of handover

Pending Publication Date: 2021-08-06
武汉空心科技有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to overcome the existing defects and provide a work platform task management and control method based on progress tracking to solve the problem that the task progress cannot be tracked in the above background technology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Working platform task management and control method based on progress tracking
  • Working platform task management and control method based on progress tracking
  • Working platform task management and control method based on progress tracking

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] A work platform task control method based on progress tracking, comprising the following steps:

[0050] Step 1: The contracting party 1 publishes the work task requirements to the task work platform 2, and the platform decomposes the tasks and finds the matching sub-tasks 5 from the platform talent pool according to the skill requirements of each sub-task, and assigns the sub-tasks to the appropriate the contractor 5;

[0051] Step 2: The contractor 5 starts working after receiving the assigned subtasks, and submits the work results to the platform after the subtasks are completed;

[0052] Step 3: After the task is handed over to the task work platform 2, the time period of the task dispatch time 14 and the task delivery time 15 and the completed tasks assigned by the work platform are counted and recorded through the timer module 16 and the counter module 19 respectively, and Through the progress estimation system 12, calculate according to the time that the task ha...

Embodiment 2

[0056] A work platform task control method based on progress tracking, comprising the following steps:

[0057] Step 1: The contracting party 1 publishes the work task requirements to the task work platform 2, and the platform decomposes the tasks and finds the matching sub-tasks 5 from the platform talent pool according to the skill requirements of each sub-task, and assigns the sub-tasks to the appropriate the contractor 5;

[0058] Step 2: The contractor 5 starts working after receiving the assigned subtasks, and submits the work results to the platform after the subtasks are completed;

[0059] Step 3: After the task is handed over to the task work platform 2, the time period of the task dispatch time 14 and the task delivery time 15 and the completed tasks assigned by the work platform are counted and recorded through the timer module 16 and the counter module 19 respectively, and Through the progress estimation system 12, calculate according to the time that the task ha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a working platform task management and control method based on progress tracking, and the method comprises the following steps: 1, a package sending party issues a work task demand to a task work platform, the task is decomposed by the platform, a matched package receiving party is searched from a platform talent pool according to the skill requirements of each sub-task, and the sub-tasks are distributed to proper package receiving parties. According to the invention, through the arrangement of the progress estimation system, calculation can be carried out through the progress estimation system according to the task proceeding time and the number of delivered result files, so that the time required for completing a single task from distribution to submission can be mastered; in this way, time estimation can be carried out on the task progress newly distributed by the working platform, and the estimated result can be respectively uploaded to the mobile terminals of the packet sender and the packet receiver through the working platform, so that the packet sender and the packet receiver can know the task progress condition and the remaining completion time, and the operation is relatively convenient.

Description

technical field [0001] The invention belongs to the technical field of platform task management and control, and in particular relates to a work platform task management and control method based on progress tracking. Background technique [0002] Computer software refers to the program and its documentation in the computer system. The program is the description of the processing object and processing rules of the computing task; the documentation is the explanatory information needed to facilitate the understanding of the program. The program must be loaded into the machine to work, and the document is generally for people to read, not necessarily loaded into the machine. Application software is software developed for a specific purpose. It could be a specific program, such as an image viewer. It can also be a collection of programs whose functions are closely related and can cooperate with each other, such as Microsoft Office software. It can also be a huge software syst...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/0631G06Q10/1091
Inventor 王琦
Owner 武汉空心科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager