Flood staging determination method based on multiple characteristic indexes

A deterministic method and multi-featured technology, applied in special data processing applications, resources, instruments, etc., can solve problems such as difficult flood seasons, heavy workload staging, and inability to flood staging

Pending Publication Date: 2021-11-09
BUREAU OF HYDROLOGY CHANGJIANG WATER RESOURCES COMMISSION
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Among them, the analysis of weather causes is based on the hydrological and meteorological analysis of the watershed, and the flood season is divided into stages according to the climate characteristics of the watershed. However, for watersheds with large catchment areas, the combination of disaster-causing weather is complicated, resulting in a large workload for this method. And staging is subjective
The mathematical statistical method generally uses the annual distribution statistics of the largest flood in the year, which is relatively simple and practical, but in the specific analysis process, the critical value needs to be selected, which is also subjective, and it is difficult to subdivide the flood season. The characteristic factors are used as the basis for staging, and there is no organic combination of meteorological factors such as precipitation, and the integrity is not enough
To sum up, the above two flood staging methods have their own advantages and disadvantages, both of which have certain subjectivity, and cannot objectively determine the flood staging.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Flood staging determination method based on multiple characteristic indexes
  • Flood staging determination method based on multiple characteristic indexes
  • Flood staging determination method based on multiple characteristic indexes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044]In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the following will further explain how the present invention is implemented in conjunction with the accompanying drawings and specific implementation methods.

[0045] refer to figure 1 As shown, a kind of flood stage determination method based on multi-feature index provided by the present invention specifically includes the following steps:

[0046] S1. Determine the flood season period of the basin according to the weather characteristics of the basin, select the statistical time length, and determine the number of calculation periods;

[0047] S2. Select the indicators that characterize the characteristics of precipitation and flood in the flood season, and count the statistical characteristic values ​​of each indicator in different calculation periods to form a sample set of each indicator;

[0048] S3. According to the sample set of each...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a flood staging determination method based on multiple characteristic indexes. The method comprises the following steps of dividing calculation time periods, selecting multi-feature indexes, constructing a projection index function, solving an optimal projection direction, calculating projection values of all the time periods and determining flood stages through ordered clustering. The method comprises the following steps: a projection index function is established by adopting a plurality of characteristic indexes capable of reflecting drainage and flood characteristics of a drainage basin on the basis of clearing the flood season duration of the drainage basin; then, through an accelerated genetic algorithm, a projection value which enables the projection index function to reach an optimal value is found, and through an ordered clustering analysis method, clustering analysis is carried out on the projection value; therefore, the flood staging is determined more objectively, and the defects of single analysis factor and subjective arbitrariness in a conventional analysis method are effectively avoided.

Description

technical field [0001] The invention relates to the technical field of hydrological calculation, in particular to a method for determining flood stages based on multi-feature indicators. Background technique [0002] In recent years, with the improvement of hydrometeorological forecasting and forecasting, the forecast period and forecasting accuracy of flood forecasting have been improved to a certain extent, making it possible for water conservancy projects to rationally utilize flood resources and exert comprehensive benefits. When it is predicted that there will be no major floods in the near future, the reservoir can properly store small and medium-sized floods to reduce the discharge flow, which will not have a great impact on the storage capacity required for major floods that may occur in the later period, and can also control the downstream mainstream to not exceed the warning water level, effectively reducing the downstream flood pressure. It is an important way to...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F16/2458G06Q10/06G06Q50/26
CPCG06F16/2462G06Q10/0639G06Q50/26Y02A10/40
Inventor 张冬冬徐高洪戴明龙李妍清陈玺李立平王含汪青静刘冬英邓鹏鑫熊丰黄燕
Owner BUREAU OF HYDROLOGY CHANGJIANG WATER RESOURCES COMMISSION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products