Bolt screwing monitoring method and system based on BIM

A bolt and position technology, applied in the field of bolt tightening monitoring based on BIM, can solve problems such as bolt torque inspection, bolt prestress and design value gap, bridge structure safety hazards, etc., to avoid missing screw, avoid torque shortage or torque The effect of exceeding the standard

Pending Publication Date: 2022-02-11
中铁桥研科技有限公司 +2
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the actual process, the number of bolts on a gusset plate is large, and construction workers generally do not have a clear understanding and understanding of the tightening sequence of high-strength bolts. Even after training, it is difficult to tighten the bolts in the set sequence. It is also difficult to check the torque of each bolt, which will lead to a large gap between the prestress of the bolt and the design value, which will bring hidden dangers to the safety of the bridge structure
If the bolts are numbered directly on the gusset plate through paint, there will be unsightly problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bolt screwing monitoring method and system based on BIM
  • Bolt screwing monitoring method and system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of them. Based on the embodiments in the present application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.

[0059] see figure 1 As shown, the embodiment of the present application provides a BIM-based bolt tightening monitoring method, which includes the following steps:

[0060]Display the identification code of the construction site selected in the BIM model on the display device at the operation end. Among them, the building information m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a BIM-based bolt screwing monitoring method and system. The BIM-based bolt screwing monitoring method comprises steps that a construction part identification code selected in a BIM model is displayed on display equipment of an operation end; the bolt positions and the screwing sequence of the construction part are displayed on the display equipment; the operation end sends screwing information to the cloud end, the screwing information at least comprises screwing time and first information, and the first information is generated after an identification code corresponding to a selected construction part in a BIM model is scanned; the cloud side judges a screwing state of the bolt at the construction part according to the screwing information, wherein the screwing state comprises screwing times and screwing time; the cloud end issues the information of the screwing state to a display device of the operation end; and the screwing state of the bolt at the construction part is displayed on display equipment of the operation end. According to the method, workers can be guided to carry out construction according to a correct screwing sequence.

Description

technical field [0001] The present application relates to the technical field of construction process monitoring, in particular to a BIM-based bolt tightening monitoring method and system. Background technique [0002] High-strength bolts are bolts made of high-strength steel, which are widely used in the field of bridge construction. In the construction process of high-strength tightening of bridges, the relevant standards of our country have clearly stipulated that each bolt must undergo two tightenings, which are called the initial tightening and the final tightening, and the tools used for the initial tightening and final tightening must be strictly designed. distinguish. At the same time, the bolts of each gusset plate must be constructed in sequence. [0003] However, in the actual process, the number of bolts on a gusset plate is large, and construction workers generally do not have a clear understanding and understanding of the tightening sequence of high-strength ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06K17/00G06Q10/10G06Q50/08
CPCG06K17/0022G06Q10/103G06Q50/08
Inventor 王波吴巨峰翟磊王熊珏李艳哲古洲扬徐联祥周强夏文祥
Owner 中铁桥研科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products