Direct generation for double symbol network chart subsystem using work part list
A technology of schedules and network diagrams, applied in data processing applications, instruments, office automation, etc., can solve the problems of difficulty in implementation, troublesome, and difficult to realize double-code network diagrams by WBS method, so as to avoid multiple conversions and reduce errors. Probability, the effect of improving design efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] The sub-system of directly generating double-coded network diagrams using work schedules is developed and designed using C++Builder 6.0 under the Windows XP operating system. Its system function structure is shown in Figure 2 in the accompanying drawings. In the input form of "inputting network diagrams in the form of work schedules", an algorithm is provided to directly generate double-code network diagrams using work schedules. This algorithm can not only avoid The multiple conversions of the network diagram reduce the probability of errors, and save the user from inputting the name of the tail node and the head node of each process, which greatly improves the design efficiency of the network diagram and enables the user to design new double codes. Very handy when working with network diagrams.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com