Process for reinforcing adjustable and controllable capping beam of piers
A process method and technology for covering beams, which can be used in bridge reinforcement, bridge, bridge maintenance and other directions, and can solve the problems of difficulty in evaluating reinforcement effect, long construction period and high stress level.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0057] Figure 1 to Figure 4 An adjustable and controllable bridge pier cap beam reinforcement process method is shown, the process method includes the construction of new piles; the implementation of shear grooves, planting bars, and chiseling on the concrete surface of the original cap beam; the newly added cap beam The construction of the concrete section; the jacking construction of the pier top jack, the construction of the steel plate under the support and the steel plate at the top of the column, the construction of section steel top tightness, plug welding, and full welding; the construction of prestressed steel beam tensioning, the specific process includes the following steps :
[0058] (1) Pour new pile foundations and pier columns at suitable positions for the old cover beams that need to be reinforced, reserve the working height of the jack between the top of the pier column column and the bottom of the cover beam, and pre-embed the jack on the top of the pier col...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com