Multisource partial discharge detection method and device of transformer substation based on space characteristic parameters
A technology of spatial features and spatial feature vectors, applied in the direction of testing dielectric strength, etc., can solve the problems of not considering multi-source partial discharge, maintenance and management of monitoring devices, time-consuming and manpower-consuming, and inconvenient operation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2014-11-19
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of high voltage and insulation in power systems, in particular to a method and device for detecting multi-source partial discharges in substations based on spatial characteristic parameters. Background technique
[0002] The existing domestic methods for monitoring and locating partial discharge in substations are basically to monitor and locate partial discharge for a single power equipment in the substation, and then evaluate the partial discharge status of the entire substation power equipment based on the monitoring situation of each power equipment. Partial discharge detection for single substation equipment (GIS geographic information system, transformer, capacitive equipment, etc.) is generally realized by monitoring electrical signals, radio frequency signals, acoustic signals or other chemical or physical quantities generated by partial discharge. In the long-term detection and maintenance process, ...
Examples
Embodiment Construction
[0025] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0026] Insulation fault is one of the most important possible faults in the operation of power equipment. Before the insulation fault of power equipment occurs, there will generally be a gradual partial discharge process, which will eventually lead to insulation breakdown. If partial discharge monitoring and diagnosis of operating equipment can be carried out during this process, partial discharge signals can be detected in time, and defects can be dealt with in advance, so that the occurrence of insulation breakdown faults can be effectively avoided. The positioning of the partial discharge location is also helpful to formulate a more targeted maintenance treatment plan, reduce power outage time, and improve maintenance efficiency.
[0027] The ultra-high frequen...