Power grid annual power purchase plan formulation method and system based on game theory

A technology of power purchase planning and game theory, applied in the directions of calculation, data processing application, forecasting, etc., can solve the problem of no systematic method for selecting the relaxation factor of power purchase cost, etc., and achieve the best effect of economy and energy saving.

Inactive Publication Date: 2012-12-12
POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD +1
View PDF1 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, the main disadvantage of using the scheme of optimizing coal consumption with the constraint of electricity purchase cost is that when determining the optimization problem, the optimization goal is to minimize the electricity purchase cost first, and then gradually release the constraint of power purchase cost, considering the optimal The change of coal consumption uses a power purchase cost slack factor to represent the degree of deregulation of the power purchase cost. However, there is no systematic method for the selection of the power purchase cost slack factor. Generally, it can only be selected based on actual experience or personal judgment of the staff. The annual power purchase plan for the power grid thus formulated is still unable to achieve the optimal balance between economics (power purchase cost) and energy conservation (coal consumption). It is still difficult to achieve an optimal balance between economics (power purchase cost) and energy saving (coal consumption) in the annual power purchase plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid annual power purchase plan formulation method and system based on game theory
  • Power grid annual power purchase plan formulation method and system based on game theory
  • Power grid annual power purchase plan formulation method and system based on game theory

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0070] see figure 1 As shown, it is a schematic flow chart of the method for formulating the annual power purchase plan of the power grid based on game theory in the embodiment of the present invention, as figure 1 As shown, the method for making an annual power purchase plan based on game theory in this embodiment includes the following steps:

[0071] Step S101: Collect the annual total load electricity E of the power grid L , the number of generator sets n in the entire grid, and the on-grid electricity price c of each generator set i , i=1, 2, L, n, the coal consumption of each generating set d i , i=1, 2,..., n, the annual power generation x of each generating set i , i=1, 2, ..., n, the upper and lower limits of the annual power generation of each generator set E imax and E imin , the annual average load rate μ of each generator set i =x i / E imax , i=1, 2, ..., n, the upper limit Δμ of the difference between the annual average load rates of each generator set, e...

Embodiment 2

[0117] In order to better understand the game theory-based annual power purchase plan formulation method proposed by the present invention, this embodiment takes a system composed of 10 generators as an example to illustrate the solution of the present invention, but this specific example is not intended as Limitations on the Protocols of the Invention.

[0118] The parameters of the 10-unit system are shown in Table 1. The upper limit of the annual power generation of each unit is the rated work of the unit multiplied by 24 hours and then multiplied by 365 days, and the lower limit of the annual power generation is zero (that is, no power generation). The upper limit of the difference between the annual average load factors of the units is Δμ=10%. The annual total load of the whole grid is set to 3.82×10 10 Spend.

[0119] Table 1 Data of 10-machine system

[0120]

[0121] In order to better illustrate the game theory-based annual grid power purchase plan formulation m...

Embodiment 3

[0142] According to the method for formulating the annual power purchase plan of the power grid based on the game theory of the present invention, the present invention also provides a system for formulating the annual power purchase plan of the power grid based on the game theory. Example to illustrate. Because the system for formulating the annual power purchase plan for the game-theoretic power grid in this embodiment is formulated according to the method for formulating the annual power purchase plan for the game-theoretic power grid in Embodiment 1, some content will not be repeated in this embodiment.

[0143] see Figure 5 As shown, it is a schematic structural diagram of the system for formulating the annual power purchase plan of the power grid based on game theory in an embodiment of the present invention, such as Figure 5 As shown, the schematic structural diagram of the annual power purchase plan formulation system based on game theory in this embodiment includes...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a power grid annual power purchase plan formulation method and system based on the game theory. The method comprises the following steps of: collecting the annual total load electric quantity of a power grid, the generator set number of a total power grid, the grid purchase price of each generator set, the coal consumption of each generator set, the upper limit and the lower limit of the annual power generation amount of each generator set, the annual average load rate of each generator set and the upper limit of the difference of the annual average load rate of each generator set; setting the parameter of the annual power generation amount of each generator set; determining a target to be optimized in the power grid annual power purchase plan; building a sub-target functional equation and a constraint equation; converting the power purchase plan into a multi-target optimization problem; on the basis of the game theory, comprehensively optimizing each target to be optimized to obtain the weight value of each target functional equation; converting a multi-target optimization problem into a single-target optimization problem; and determining to obtain the power generation plan value of the annual power generation amount of each generator set. According to the power grid annual power purchase plan formulation method disclosed by the invention, a plurality of targets can be both considered while the power purchase plan is formulated, and meanwhile, a plurality of targets are optimized.

Description

technical field [0001] The invention relates to the field of formulating an annual power purchase plan for a power grid, in particular to a method and system for formulating an annual power purchase plan for a power grid based on game theory. Background technique [0002] Under the system of "energy-saving power generation dispatching", the main goal of power dispatching is to minimize the energy consumption and emissions of power grid generating units, but the economics of power grid dispatching have not been fully reflected. Especially when there is a conflict between energy-saving power generation scheduling goals and economic scheduling goals, economic requirements are easily overlooked, and it is difficult to find a reasonable balance between the two goals. [0003] Energy-saving power generation scheduling requires power grid companies to prioritize renewable power generation resources in accordance with the principle of energy conservation on the premise of ensuring r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04
Inventor 卢恩马煜华陈亮刘锋李嘉龙王一陈雨果魏韡龚媛
Owner POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products