Integral squeezing steel strand anchorage stay rope and manufacturing method thereof
A production method and technology for steel strands, which are applied to structural elements, building components, building reinforcements, etc., can solve the problems of short service life, difficult thread processing, narrow application range, etc., so as to reduce production costs, reliable anchoring performance, The effect of reducing the difficulty of processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] figure 2 Disclosed is an integrally extruded steel strand anchor cable, including a finished steel strand cable 2 and an internally extruded cable anchor installed on the exposed steel strand 201 at the end of the finished steel strand 2 Tool 1, the inner extrusion type cable anchor 1 includes an extrusion anchor cup 103 with a long external thread 1031, an adjusting nut 104 installed on the extrusion anchor cup 103 and with a long internal thread, connected to the Squeeze the sealing cylinder 105 at the end of the anchor cup 103. A sealing device 107 is installed between the end of the sealing cylinder 105 and the finished steel strand cable 2. The inner end of the extrusion anchor cup 103 is provided with a locking screw plug for installation The threaded hole 1032 of 101, the other end is provided with a straight hole 1034 for passing the whole bundle of bare steel strands, and a tapered hole 1033 is provided between the threaded hole 1032 and the straight hole 1034...
Embodiment 2
[0055] A method for manufacturing an integrally extruded steel strand anchor cable, comprising the following steps:
[0056] A. Processing of various parts and finished steel strands:
[0057] The parts of the inner extrusion cable anchor 1 are processed according to the requirements. The inner extrusion cable anchor 1 includes an extrusion anchor cup 103 with a long external thread 1031 and a long inner Threaded adjusting nut 104, sealing cylinder 105, sealing device 107 and anti-loosening screw plug 101; at the same time, make finished steel strand cable 2 as required, and strip off the protective layer of the steel strand at the end of finished steel strand cable 2 fall to form a bare steel strand 201;
[0058] b. assembly:
[0059] Screw the adjusting nut 104 on the squeeze anchor cup 103, and connect the squeeze anchor cup 103 with the sealing cylinder 105;
[0060] c. Wear steel strands and clips:
[0061] Insert the bare steel strand 201 into the squeeze anchor c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com