Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Base band resource sharing method and system of high-capacity base band pool

A technology of resource sharing and baseband pooling, which is applied in connection management, wireless communication, electrical components, etc., and can solve the problems of limited BBU capacity and limited number of baseband resources.

Active Publication Date: 2013-05-08
ZTE CORP
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The current baseband pool only implements baseband resource sharing within a BBU. The capacity of a single BBU is limited, and the hardware cost of the BBU and the existing hardware integration level limit the number of baseband resources that can be reused.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Base band resource sharing method and system of high-capacity base band pool
  • Base band resource sharing method and system of high-capacity base band pool
  • Base band resource sharing method and system of high-capacity base band pool

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0069] figure 2 It is a schematic flowchart of Embodiment 1 of the distributed baseband resource sharing method for realizing a large-capacity baseband pool in the present invention. When the BBU is a common BBU, when the BBU cannot obtain the required baseband resources from itself, it requests an idle baseband from other network elements. Resources, the specific implementation method for the other network elements to find idle baseband resources from themselves or other BBUs connected to themselves, such as figure 2 As shown, the method includes the following steps:

[0070] Step 201, establishing a connection between the BBU and the switching device and between the switching device and the switching device;

[0071] Specifically, such as image 3 As shown, the configuration information of all physical connections in the figure is configured to the BBU and the switching device, such as the port information of the network switching unit where the control unit of BBU 1 is ...

Embodiment 2

[0082] Figure 4 It is a schematic flow diagram of Embodiment 2 of the distributed baseband resource sharing method of a large-capacity baseband pool in the present invention. When the BBU is a BBU with an integrated switching function, when the BBU cannot obtain the required baseband resources from itself, it requests from other network elements Idle baseband resources, the specific implementation method for the other network elements to find idle baseband resources from themselves or other BBUs connected to themselves, such as Figure 4 As shown, the method includes the following steps:

[0083] Step 401, establishing the connection between the BBU with integrated switching function and other common BBUs, and the connection between the BBU with integrated switching function and the BBU with integrated switching function;

[0084] Specifically, such as Figure 5 As shown, in this embodiment, the BBU (such as BBU1) is a BBU with an integrated switching function. The control ...

Embodiment 3

[0097] Figure 6 It is a schematic flowchart of Embodiment 1 of the centralized baseband resource sharing method for realizing a large-capacity baseband pool in the present invention. When the BBU cannot obtain the required baseband resources from itself, it requests idle baseband resources from other network elements, and the other network elements The specific implementation method for the unit to find idle baseband resources from itself or other BBUs connected to itself, such as Figure 6 As shown, the method includes the following steps:

[0098] Step 601 is the same as step 201.

[0099] Step 602, the BBU reports the state of the baseband resource to the switching device connected to itself in real time, or the switching device collects the state of the baseband resource of the BBU connected to itself;

[0100] Specifically, the control unit of the switching device (such as switching device 1 and switching device 2) uniformly manages and allocates the baseband resources...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a base band resource sharing method of a high-capacity base band pool. The base band resource sharing method of the high-capacity base band pool comprises: when a battery backup unit (BBU) can not acquire needed base band resources from the BBU, the BBU requests unoccupied base band resources from other network elements, and the other network elements search for the unoccupied base band resources from the other network elements and other BBUs connected with the other network elements. The invention further provides a base band resource sharing system of the high-capacity base band pool. Through the base band resource sharing method and the system of the high-capacity base band pool, dynamic sharing of the base band resources between the BBUs in the high-capacity base band pool can be achieved, and therefore base band resource reuse capacity of the whole high-capacity base band pool is not limited by a single BBU.

Description

technical field [0001] The present invention relates to the field of wireless networks, in particular to a method and system for sharing baseband resources of a large-capacity baseband pool. Background technique [0002] In the current wireless network, the base station mostly adopts the architecture of baseband processing unit (BBU, Building Base band Unit) + radio frequency remote unit (RRU, Radio Remote Unit). The two are connected by optical fiber, and BBU and RRU can be a pair One-to-many or one-to-many. This BBU+RRU architecture allows baseband resources to be placed in a centralized manner, enabling the sharing of supporting resources such as computer rooms, backup power, and transmission, reducing network construction costs, reducing network energy consumption, facilitating network maintenance, and reducing operation and maintenance costs. [0003] Generally speaking, the baseband resources in the BBU are dynamically shared with the RRU. That is to say, a certain ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04W72/00H04W76/02
Inventor 李蕾
Owner ZTE CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products