Method for conducting product life-cycle management on power grid GIS service
A full lifecycle, power grid technology, applied in the direction of data processing applications, instruments, calculations, etc., can solve the lack of analysis and monitoring means for the entire life cycle of power grid GIS services, lack of management means for power grid GIS services, and low operating efficiency of power grid GIS services, etc. problems, to achieve the effect of satisfying sharing and business integration, improving operational performance, and improving standardization
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2013-09-25
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1
Abstract
Description
Technical field
[0001] The invention relates to a power grid GIS service management method, in particular to a method for full life cycle management of power grid GIS services. Background technique
[0002] The grid GIS platform is the application of GIS software in the power industry. It provides grid model construction and grid resource management functions, and realizes the accounting information and spatial location of grid resources such as power generation, transmission, transformation, distribution, communication and metering devices in the grid. The unified maintenance and management of information and power grid topology information builds a unified digital power grid. Based on the digital power grid model, relevant business applications are carried out to improve the lean management level of the power grid. The grid GIS platform builds a grid GIS platform with an open architecture and universal technology, integrates grid resources in a digital way, and provides grid sp...
Examples
Embodiment Construction
[0012] Such as figure 1 The flow chart of the present invention is shown in a schematic diagram. The steps of the present invention include:
[0013] Step a, the grid GIS service registration management, the grid GIS service is registered to the enterprise service bus, and the grid GIS service is managed in the enterprise service bus according to the directory structure; the directory is to help the project organize the resources of the project more organized , Realize the orderly management of resources in the project through the catalog.
[0014] Step b, integration application management. When the application system makes an integration application for the grid GIS service, the integration application is sent to the grid GIS service platform administrator for approval; the grid GIS service platform administrator accepts the integration application and approves the integration application; the approval is passed , The grid GIS service information is sent to the application syst...