Construction method for settlement observation points of building
A technology for building settlement and settlement observation, which is applied in measuring devices, surveying and navigation, height/horizontal measurement, etc. It can solve the problems of easy damage of settlement observation points, random construction operations, poor use effect, etc., and can easily guarantee the processing quality , Low construction cost and convenient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Such as figure 1 A kind of building settlement observation point construction method shown, the quantity of the settlement observation point that is set on the construction building is a plurality of, and a plurality of described settlement observation points are all arranged on the bottom load-bearing structure 5 of the construction building, The bottom load-bearing structure 5 is a wall and / or a column, and both the wall and the column are reinforced concrete structures. combine figure 2 , the bottom load-bearing structure 5 is provided with a settlement observation device, and the settlement observation device includes a settlement observation point protection box, an anchor rod 1 and a measuring rod used in conjunction with the anchor rod 1, and the anchor rod 1 and the settlement The number of observation point protection boxes is multiple and the number of both is the same as the number of the settlement observation points. A plurality of the anchor rods 1 and a...
Embodiment 2
[0082] Such as Figure 4 As shown, in this embodiment, the difference from Embodiment 1 is that the protection boxes of the settlement observation points installed on the plurality of settlement observation points are all exposed protection boxes, and the installation process is as follows:
[0083] Step 2021, construction of the bottom load-bearing structure: first bind the reinforcement cage set in the bottom load-bearing structure 5, and then support the formwork on the outside of the reinforcement cage that has been bound, and then pour concrete to obtain the formed structure. Describe the bottom bearing structure 5.
[0084] Step 2022, installation of protection boxes: according to the measurement and setting-out results in step 1, the boxes 3-1 of the protection boxes of settlement observation points installed on multiple settlement observation points are fixed in step 2021 and the construction is completed on the outer side wall of the bottom load-bearing structure 5 ....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com