Performance management system of electric transmission and transformation devices

A technology for power transmission and transformation equipment and equipment management, applied in the direction of data processing applications, instruments, calculations, etc., can solve the lack of equipment management system, lack of maintenance strategy, asset management strategy is not perfect equipment management technical support system and equipment management index system And other issues

Inactive Publication Date: 2014-07-09
YUN NAN ELECTRIC TEST & RES INST GRP CO LTD ELECTRIC INST +1
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Technically speaking, one is the lack of a maintenance strategy based on equipment status and reliability; the other is the lack of a status and risk-based equipment management system, such as under the guidance of the company's asset strategy, formulate equipment management strategies, asset renewal, transformation, planning, How to formulate the overhaul and technical transformation plan, I have a lot of thoughts, which brings great risks to the company. For the massive power grid equipment, the distribution of risk points is not clear, and there is a lack of risk assessment and hidden danger management mechanism; Appropriate equipment management guarantee mechanism
If the company does not have a clear asset management strategy and strategy, a complete equipment management technical support system and equipment management index system, it is impossible to formulate a standardized equipment operation management system and equipment guarantee mechanism, and it is difficult to ensure the realization of the strategic goals of modern equipment management of various power grid companies

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Performance management system of electric transmission and transformation devices
  • Performance management system of electric transmission and transformation devices

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] A performance management system for power transmission and transformation equipment, which is used for online performance management of power transmission and transformation equipment. The feature of the present invention is that the system consists of an equipment management center 1, a data collection module 2, a strategy development module 3, a strategy management module 4, The strategy evaluation module 5 and the performance analysis module 6 are sequentially connected to form; the performance analysis module 6 is also connected to the strategy development module 3; wherein:

[0024] Equipment management center 1 is used to centrally manage the performance management data and results of power transmission and transformation equipment, and issue corresponding management instructions to power transmission and transformation equipment, and then send them to the data collection module;

[0025] The data collection module 2 is used to collect the data information required...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a performance management system of electric transmission and transformation devices. The performance management system comprises a device management center, a data collecting module, a strategy development module, a strategy management module, a strategy assessment module and a performance analysis module. The device management center, the data collecting module, the strategy development module, the strategy management module, the strategy assessment module and the performance analysis module are connected. Meanwhile, the performance analysis module is connected with the strategy development module and the device management center. According to the performance management system, power grid production persons, scientific research persons and management persons can conveniently carry out online performance management on the electric transmission and transformation devices according to conditions of the electric transmission and transformation devices, in this way, accurate maintenance strategies can be easily developed for the electric transmission and transformation devices, decision making supports can be easily provided, and required performance management results of the electric transmission and transformation devices can be inquired according to inquiring conditions.

Description

technical field [0001] The invention relates to a management system, and more specifically relates to the technical field of a performance management system for power transmission and transformation equipment. Background technique [0002] With the development of society and economy, the biggest challenge facing the equipment management of domestic power grid companies is how to pursue the most efficient equipment asset management after the company's assets have undergone extraordinary development to ensure the safety of production and meet the needs of grid security and service. to the company's long-term strategic goals. From the perspective of the company, equipment management includes two issues: how to plan for asset expansion and how to manage equipment assets. At present, the equipment management of domestic power grid companies adopts the method of patrol inspection and pre-test fixed inspection, which is basically in the second-generation equipment management stage...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
Inventor 于虹魏杰刘静萍郑易谷冯彦钊高孟平邹立峰
Owner YUN NAN ELECTRIC TEST & RES INST GRP CO LTD ELECTRIC INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products