Building construction supervision method based on BIM

A construction and building technology, applied in the field of information management, can solve problems such as suboptimal countermeasures, deviations, and limited implementation effects, and achieve the effects of shortening the construction period, saving costs, and improving production efficiency
CN104077653AInactive Publication Date: 2014-10-01SHANGHAI RES INST OF BUILDING SCI CO LTD +2

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Applications(China)
Current Assignee / Owner
SHANGHAI RES INST OF BUILDING SCI CO LTD
Publication Date
2014-10-01
Estimated Expiration
Not applicable Β· inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention discloses a building construction supervision method based on a BIM and relates to the technical field of information management. The building construction supervision method based on the BIM achieves the technical goals of improving production efficiency, saving cost and shortening the construction period. The building construction supervision method based on the BIM includes the steps that the BIM of a building is built firstly according to architectural features of the building, and when the building goes wrong in the construction process of the building, building construction is supervised according to the BIM of the building. The building construction supervision method based on the BIM is applicable to building construction.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The present invention relates to information management technology, in particular to a BIM-based building construction supervision method technology. Background technique

[0002] During the building construction process, it is necessary to collect various building information in real time (such as the sunshine of the building, the heat transfer status of the external maintenance structure, etc.). All construction entities, including the construction operation unit, provide a basis for collaborative work in order to improve production efficiency, save costs, and shorten construction periods.

[0003] However, in the existing construction supervision methods, engineering and technical personnel make judgments based on the collected construction information and construction experience. This manual judgment often has large deviations, and the final countermeasures are often It is not optimal, and its implementation effect is limited, so the existing cons...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More