A hoop-type leak-stopping device for leaking from tee fittings in gas pipelines
A technology for gas pipelines and tee fittings, which is applied in the direction of pipes/pipe joints/fittings, pipe components, mechanical equipment, etc., and can solve large-diameter gas pipeline leakage, pipeline tee fitting leakage, plugging and repair point leakage, etc. problems, to achieve the effect of easy operation, leakage prevention and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] see now Figure 1 ~ Figure 3 , figure 1 It is a schematic diagram of the unfolded structure of the hoop-type leak-stopping device according to the embodiment of the present invention, figure 2 It is the front view of the hoop-type leak-stopping device according to the embodiment of the present invention, image 3 It is a top view of the hoop-type leak-stopping device according to the embodiment of the present invention. As shown in the figure, the first arc plate 2 is matched with the gas tee main pipe 8, and its length is twice the diameter of the branch pipe 9. There are four tie bars arranged side by side along the edge of the arc plate on one side of the main pipe 8. 3. One end of the tie bar 3 is solidly welded with the first circular arc plate 2, and the other end is welded with bolt hole plates 4a, 5b; Two tie bars 3 are arranged side by side on the edge of the plate, one end of the tie bar is welded with the first arc plate 2, and the other end is welded wit...
Embodiment 2
[0040] A method for using a hoop-type leak plugging device for leakage at a tee pipe fitting of a gas pipeline, which is characterized in that it includes the following steps:
[0041]a. Pre-fabricated hoop-type plugging device used for leakage at the tee fittings of gas pipelines
[0042] According to the diameter of the gas pipeline, a hoop-type plugging device for leakage at the tee fittings of the gas pipeline is pre-processed. The first circular arc plate 2 is matched with the gas tee main pipe 8, and the length is 9 diameters of the branch pipe. 2 times, it is provided with 4 tie bars 3 side by side along the edge of the arc plate on one side of the main pipe 8, one end of the tie bars 3 is solidly welded with the first arc plate 2, and the other end is welded with bolt hole plates 4a, 5b; The middle of the other side is provided with a concave arc, and two tie bars 3 are arranged side by side on the edges of the arc plates on both sides of the branch pipe 8, one end of ...
PUM
Login to View More Abstract
Description
Claims