Rapid construction method for long and long double-arch tunnel
A construction method and technology for tunnel construction, applied in tunnels, earthwork drilling, mining equipment, etc., can solve problems such as inability to construct partition walls and inability to excavate main holes, achieve reliable economical construction, increase construction work surface, eliminate safe effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:
[0018] A rapid construction method for long and long double-arch tunnels. First, the tunnel is divided into 2n sections along the longitudinal direction according to the length, that is, from the tunnel entrance to the exit, it is divided into 0-1 sections, 1-2 sections, ..., n -1~n section, ..., 2n-1~2n section, the tunnel is constructed simultaneously from the entrance and exit. In this embodiment, n=3 is taken as an example for introduction. In actual construction, the value of n can be determined according to the construction period, construction cost and on-site construction organization requirements. The following implementation steps are all explained by the tunnel construction of sections 0-3, and the tunnel construction of sections 4-6 and the tunnel construction of sections 0-3 are carried out symmetrically at the same time, and will not be repe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com