Rapid construction method for long and large double-multiple arch tunnel

A construction method and tunnel construction technology, which is applied to tunnels, earthwork drilling, mining equipment, etc., can solve problems such as partition walls that cannot be constructed, and tunnels that cannot be excavated, so as to achieve economical and reliable construction, increase the construction work surface, eliminate safe effect

Active Publication Date: 2015-09-16
江苏中车城市发展有限公司
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The present invention aims to provide a safe, rapid and economical rapid construction method for long double-arch tunnels, which can solve the problem that the middle partition wall cannot be constructed before the middle pilot tunnel is penetrated in the construction of the three-pilot tunnel method, which leads to the inability to open the main tunnel The technical problems of excavation can be avoided, and the safety and quality hidden dangers brought about by the trench-hopping excavation method of the middle partition wall and the excavation method without pilot tunnel can be avoided

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid construction method for long and large double-multiple arch tunnel
  • Rapid construction method for long and large double-multiple arch tunnel
  • Rapid construction method for long and large double-multiple arch tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] In the following, the present invention will be further explained through the embodiments and the accompanying drawings:

[0018] A rapid construction method for a long and large double-arch tunnel. First, the tunnel is divided into 2n sections along the longitudinal direction according to the length, that is, from the entrance to the exit of the tunnel, it is divided into 0~1, 1~2,...,n -1~n section,..., 2n-1~2n section, the tunnel enters the tunnel from the entrance and exit at the same time. In this embodiment, n=3 is taken as an example for introduction. In actual construction, the value of n can be selected according to the construction period, cost, and on-site construction organization requirements. The following implementation steps are all described with the construction of sections 0 to 3. The construction of sections 4 to 6 and the construction of sections 0 to 3 are carried out symmetrically at the same time, so I will not repeat them here. The thick solid arr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a rapid construction method for a long and large double-multiple arch tunnel. The tunnel is equally divided into 2n sections according to the length along the longitudinal direction; 0-n section of tunnel construction is used for illustration; n-2n section of tunnel construction and 0-n section of tunnel construction are symmetrically carried out at the same time. The method comprises the steps: step (1), 0-1 section is constructed in a hole, a mid-guiding hole is firstly excavated and supported, and a left side wall guiding hole and a right side wall guiding hole are excavated and supported in a way of lagging the mid-guiding hole for a certain safe distance; and step (2)-step (5), construction passages are alternately converted to continue carrying out a next period of construction; the phenomenon that mutual interference happens to construction of a middle wall, the left side wall guiding hole, the right side wall guiding hole, the mid-guiding hole, a left main hole and a right main hole; the middle wall at a (n-1)st contact channel is constructed after the construction of n-2 section-n-1 section of left main hole and n-1 section-n section of middle wall is completed; afterwards, the construction passages are converted again; and the left main hole and the right main hole are respectively used as respective construction passages to complete the construction of the rest n-1 section-n section of left main hole and right main hole.

Description

Technical field [0001] The invention relates to the field of tunnel construction, and is particularly suitable for a double-arch construction method. Background technique [0002] In recent years, double-arch tunnels have gradually been favored by people due to their advantages of easy wiring, less land occupation, and environmental protection. In view of different geological conditions, the traditional double-arch tunnel construction methods mainly include: middle pilot tunnel construction method, three pilot tunnel construction method, single tunnel construction method and double tunnel full-section parallel construction method. Among them, under the conditions of grade Ⅳ and Ⅴ surrounding rock, especially for large-section tunnels, the current three pilot tunnel construction method is mainly adopted. This construction method has the advantages of early closure of the main tunnel support and high structural safety during the construction process. The construction sequence is t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00
Inventor 王猛张艳艳冀文有刘化宽
Owner 江苏中车城市发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products