Method for screening optimum indexes of reservoir flood control dispatching scheme based on BP neural network
A BP neural network, flood control dispatching technology, applied in the direction of neural learning methods, biological neural network models, instruments, etc., can solve the identification process of lack of index importance and sensitivity, large subjective randomness, and threshold problems have not been obtained effectively solve problems
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2015-11-11
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to reservoir flood control scheduling technology, in particular to a method for screening optimal indicators of reservoir flood control scheduling schemes. Background technique
[0002] Reservoir flood control and dispatching technology is an important non-engineering measure to realize flood control and disaster reduction in a river basin, and is closely related to social, economic, natural, ecological and other factors. At present, the more common practice is to generate a set of feasible schemes through the flood control dispatching model, and the decision maker chooses a satisfactory scheme that comprehensively weighs the benefits of each target and puts it into decision-making. .
[0003] Existing methods have relatively subjective arbitrariness in the selection of indicators, generally lack the identification process of the relative importance and sensitivity of indicators, and the criteria for indicator selection and the c...
Examples
Embodiment Construction
[0063] In order to solve the above-mentioned problems in the prior art, the applicant has conducted in-depth and creative research work on the prior art.
[0064] The applicant believes that the evaluation indicators of reservoir flood control dispatching schemes are a series of measures to measure the merits of dispatching schemes from different target levels and different evaluation angles (such as: reservoir safety, downstream safety, power generation efficiency, flood resource utilization efficiency, etc.) gather. In essence, program evaluation is to use a certain mathematical model to integrate each index value of each program into a comprehensive evaluation value, and to sort and optimize the programs according to the size of the comprehensive evaluation value.
[0065] The study found that the existing research on the evaluation of reservoir flood control schemes mainly focuses on the evaluation method and its improvement. There is a large subjective arbitrariness in th...