Method of Pouring Bituminous Mortar in Deep Slot Holes

A technology of asphalt mortar and slotted holes, applied in dams, buildings, barrages, etc., can solve problems such as water leakage between layers of asphalt concrete core walls, uneven technology, difficulties, etc., and achieve fast repair, reliable remedial methods, and fast methods Effect

Active Publication Date: 2017-12-22
GEZHOUBA GRP NO 2 ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In our country, the technology of applying RCC as the anti-seepage core wall in earth-rock dams is uneven, while the RCC or cast-type asphalt concrete core wall is constructed layer by layer, and each layer is even every 1 meter. Water leakage will occur if the interlayer bonding is not good; especially the cast asphalt concrete core wall is prone to water leakage due to the separation of aggregates or insufficient vibration; the asphalt concrete core wall will inevitably have interlayer water leakage. Leakage of the asphalt concrete core wall was discovered when the project had been completed, and such incidents had already occurred in the completed dam; after the completion of the dam, it was not only difficult to excavate the asphalt concrete for re-construction, but also had to excavate the dam shell material at the same time. Rebuild the dam, the repair cost is very high and time-consuming; the current solution is to make a cement concrete cut-off wall in the dam shell material, which has a long construction period, high cost and low reliability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method of Pouring Bituminous Mortar in Deep Slot Holes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0011] see figure 1 , the method for pouring asphalt mortar in the deep groove hole of the present embodiment comprises the following steps:

[0012] 1) Drill slot hole 2 on asphalt concrete core wall 1;

[0013] 2) Before pouring asphalt mortar, clean up the sundries in the slot, make the bottom of the slot and the wall of the slot clean and dry, and lower the chute 3 heated to 90°C to the bottom of the slot where the asphalt mortar is to be poured;

[0014] 3) Pouring asphalt mortar 4 upwards from the bottom of the slot hole. When pouring, first heat the part where the asphalt mortar will be poured and the area 40-50 cm above it. The heating temperature is 50°C, and then pour 150°C left and right asphalt mortar. The height of each pouring The ascent speed is 25cm / min; during pouring, there are measures for shielding rainwater to prevent rainwater from entering the pouring hole; after pouring all the slot sections, the leaky asphalt concrete core wall is quickly repaired. T...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for pouring bituminous mortar in a deep slotted hole during water leakage repairing in a deep position (the depth is 10 m at least) of a bituminous concrete impervious core wall in projects of water conservancy and water-power engineering earth and rockfill dams and tailing debris retaining dams. According to the method, the slotted hole is drilled in the bituminous concrete core wall, the bituminous mortar is poured in the slotted hole upwards from the bottom of the slotted hole, and the bituminous concrete core wall leaking water in the deep position is quickly repaired. The method is simple and reliable, the effect that the poured bituminous mortar and bituminous concrete of the hole wall are integrated can be guaranteed, and the cooled bituminous mortar and an external building form a complete structural body.

Description

Technical field: [0001] The present invention relates to a method for pouring asphalt mortar in deep slots for repairing water leaks in the depth of asphalt concrete anti-seepage core walls (at least 10m in depth) in earth-rock dams and tailings dams in water conservancy and hydropower projects method. Background technique: [0002] In the construction of roller compacted or poured asphalt concrete core walls of earth-rock dams in water conservancy and hydropower projects, water leakage will not occur when the porosity of asphalt concrete is not greater than 4%, and water leakage often occurs between the two layers of asphalt concrete. [0003] The rolling and pouring asphalt concrete anti-seepage core wall structure of the earth-rock dam has the advantages of small engineering volume, fast construction speed, and no interference to the dam construction; the rolling and pouring asphalt concrete is used as the anti-seepage in the design of the earth-rock dam The core wall ma...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D15/00E02B7/06E02B7/08
CPCE02B7/06E02B7/08E02D15/00
Inventor 朱志坚
Owner GEZHOUBA GRP NO 2 ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products