A method for constructing shaft-type underground parking garage by freezing method

A technology of freezing method and construction well, which is applied in infrastructure engineering, artificial islands, water conservancy projects, etc. It can solve the problems of unsealable adjacent wall sections, uneven stress on the well wall, and inability to seal the blade foot, etc., achieving thickness and Effective control of strength, guaranteed construction period and high construction quality

Active Publication Date: 2019-12-20
CHINA COAL NO 5 CONSTR
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

2) There must be a stable rock formation at the bottom of the caisson, otherwise the blade foot cannot be sealed
4) During the caisson construction process, the wellbore will be greatly inclined due to various reasons, and the uneven stress on the well wall will easily cause cracks. If it is used for lifting, it will affect the use
2) If the construction method is improper or the construction geological conditions are special, it may cause water leakage because the adjacent wall sections cannot be closed
3) If the underground diaphragm wall is used as a temporary retaining structure, it will cost more than other methods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for constructing shaft-type underground parking garage by freezing method
  • A method for constructing shaft-type underground parking garage by freezing method
  • A method for constructing shaft-type underground parking garage by freezing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] A method for constructing shaft-type underground garages by freezing method. Utilizing the freezing method and modern mine well construction technology (excavation method, grouting method behind the wall), a circular shaft shaft is built underground, and the currently widely used elevator at home and abroad The intelligent tower-type three-dimensional garage system is installed and operated in the shaft.

[0045]Taking the reinforced concrete structure (outer wall 500mm, inner wall 600mm) of garage shaft wall design, structure diameter 17-20m, depth 50-80m, height of each floor 1.8m, and the bottom of the wellbore closed with reinforced concrete as an example, the construction process is as follows.

[0046] 1. Freezing method construction

[0047] Freezing hole layout see figure 2 , image 3 . Design and arrange a comprehensive construction scheme in which two circles of freezing holes operate together. The two rings of freezing holes cooperate and complement each...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a freeze construction method for wellbore type underground parking garage. A circular wellbore is built underground by sequentially using freeze construction, excavation construction, grouting and thaw grouting, and an elevator type and intelligent tower type stereo garage system currently applied at home and abroad is installed in the wellbore for operation. Before construction of the wellbore, an artificial freezing method is applied, water-bearing strata around the wellbore is frozen, a frozen wall having temporary load bearing and water isolating functions and meeting construction safety requirements is formed, and wellbore excavation is performed under protection of the frozen wall; the frozen wall is formed by mutual matching mutual complementing of inner ringfreezing holes and outer ring freezing holes; a cap beam is firstly constructed at the top of the wellbore; excavation construction of the outer wall of the wellbore, concrete pouring on the bottom plate of the wellbore and construction of the inner wall of the wellbore are performed in sequence; after freezing of the wellbore, lining is performed, and grouting and strata thaw are performed for grouting compensation.

Description

technical field [0001] The invention relates to the technical field of shaft-type underground parking garage construction, in particular to a method for constructing a shaft-type underground parking garage by freezing method. Background technique [0002] At present, there is one shaft-type underground garage that has been built and operated in China, and 3 to 4 shaft-type underground garages are under construction. The cities that plan to build shaft-type underground garages include Harbin, Beijing, Tianjin, Guangzhou and other cities. The shaft-type underground garages that have been built or are under construction are constructed using the caisson method or the underground diaphragm wall method. There is no precedent for the construction of the freezing method, and the construction of the freezing method has a certain application and promotion value. [0003] The artificial ground freezing method is not only suitable for loose and unstable alluvium and water-bearing rock ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D3/115E02D29/00
CPCE02D3/115E02D29/04
Inventor 程志彬袁兆宽王鹏越王申张步俊张坤
Owner CHINA COAL NO 5 CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products