[0052] The non-residual fault treatment strategy of the main control chamber of the digital pressure hydraulic stack is taken as an example of the analysis method of the present invention:
[0053] 1) The unit has the possibility of unrebertable in each mode of operation, thus determining the working conditions in various operating modes of the unit, and the main control room must be carried out in the main control chamber. Strategy analysis. The main pump determines the strategy used during the retreat process, thus collecting the operability of the main pump as an important factor, and considers the operability of the main pump in the analysis.
[0054] For the anecdote operation, for each initial operating conditions, there is no need to consider the operational strategy of adjacent working conditions, and design the best way to design the best airway.
[0055] In the selection of the retreat strategy, try to multiplex the operation modules of the existing proven procedures, use...