Preparation technology of stainless steel baking varnish door
A preparation process, stainless steel technology, applied to the surface coating liquid device, pretreatment surface, coating, etc., can solve the problems of affecting the appearance, easy peeling of the top coat, etc., and achieve good antirust effect, good gloss, Good waterproof effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A preparation process for a stainless steel paint door, comprising the following steps: a. Pretreatment: polishing the stainless steel with sandpaper, using laser planing, welding, bending, and welding angles to process it into a door shape, and finally polishing the surface of the door panel Processing, made into a fine billet, and the fine billet is subjected to secondary grinding treatment to prepare for spraying primer.
[0022] b. Spray primer: Wrap the outer surface of the pretreated door panel and its surroundings with polyvinyl chloride plastic film and perform blister and compression treatment to prepare the primary product and perform the first painting treatment, and bake it in a baking oven. The temperature in the furnace for this operation is 90°C, and the temperature in the furnace is raised to 180°C to continue baking, and the continuous baking time is 25 minutes. , c. Spray topcoat: put the above-mentioned door panels out of the oven into the oven after ...
Embodiment 2
[0026] The difference between this embodiment and above-mentioned embodiment 1 is:
[0027] In the step b, the temperature of the door panel entering the furnace is 95°C, the temperature in the furnace rises to 185°C, and the baking time is continued for 25 minutes;
[0028] In the step c, the temperature of the door panel entering the furnace is 95°C, and it is dried under the condition that the temperature in the furnace rises to 185°C, and the continuous baking time is 20 minutes;
[0029] In the step f, the above-mentioned treated door panel is put into the furnace at 95° C., and the temperature in the furnace is raised to 195° C. to continue baking for 15 minutes.
Embodiment 3
[0031] The difference between this embodiment and above-mentioned embodiment 1 is:
[0032] In the step b, the temperature of the door panel entering the furnace is 100°C, the temperature in the furnace rises to 190°C, and the baking time is continued for 25 minutes;
[0033] In the step c, the temperature of the door panel entering the furnace is 100°C, and the temperature in the furnace is raised to 190°C to continue baking, and the continuous baking time is 20 minutes;
[0034] In the step f, put the treated door panel into the furnace at 100° C., and the temperature in the furnace rises to 195° C. to continue baking for 15 minutes.