A roadbed filling method of prefabricated concrete pipe joint reinforced light soil
A technology of prefabricated concrete and lightweight soil, applied in roads, buildings, roads, etc., can solve problems such as the inability to use radar non-destructive testing, slow construction progress, and weak integrity, so as to improve the integrity of the roadbed, strengthen the integrity, The effect of avoiding material waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0054] Taking the abutment back filling in the subgrade filling as an example, in this embodiment, the predetermined filling height of light soil is H, and the slope slope on both sides of the non-light soil subgrade is 1:x, where x takes 1~ 2. The size of the outer edge of the cross-section of the precast concrete pipe joint is uniform, and the size of the inner edge and the height of the pipe joint are adjusted according to the buried position of the pipe joint in the subgrade and the requirements of the load intensity; the compressive strength of the precast concrete pipe joint is f c , the slope of non-light soil subgrade excavation is 1:1~1:1.3, and the platform width b=(2y+1)r 0 , 0≤y≤2 and y is an integer, r 0 is the radius of the concrete pipe joint.
[0055] Cushion layer adopts gravel with a particle size of 1-3cm. Each layer of prefabricated concrete pipe joints is arranged staggeredly, and n layers can be arranged in total. There is a filling area between the con...