An integrated monitoring device and measurement method for seepage pressure and settlement in soft soil foundation
A monitoring device and technology for soft soil foundations, applied in the field of safety monitoring of seepage pressure and settlement, can solve the problems of bending deformation of side bars of settlement plates, breaking of piezometer cables, and inability to replace them, so as to reduce the hysteresis problem and solve the Settlement error, easy and fast operation effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Combine below figure 1 For further explanation, an integrated monitoring device for seepage pressure and settlement in soft ground, including a measuring tube, the measuring tube is divided into a measuring tube permeable tube 2 and a measuring tube aqueduct 1, a measuring tube permeable tube 2 and a measuring tube aqueduct 1 is provided with a settlement bottom plate 3, the bottom of the measuring tube permeable tube 2 is sealed, and a protective tube is provided outside the measuring tube. The protective tube includes a protective tube movable tube 4 and a protective tube fixed tube 5. Above, a piezometer 6 is installed in the permeable pipe 2, and a cable 7 is connected to one end of the piezometer 6. The permeable pipe 2 of the measuring tube is provided with a number of openings, and the area of the openings accounts for 10% to 20% of the surface area of the permeable pipe of the measuring tube; it can ensure that the water flows out, but it is not too fast to ...
Embodiment 2
[0026] A measurement method using an integrated monitoring device for seepage pressure and settlement in soft ground, comprising the following steps
[0027] a. Bury the monitoring device at the designed position, fill the aqueduct of the measuring tube with water until it is flush with the mouth of the tube, and use the piezometer to measure the water pressure to convert the vertical distance from the nozzle of the aqueduct section of the measuring tube to the subsidence floor, the first time The measurement is taken as the initial value H0, and the subsequent measurement is taken as the measured value H1;
[0028] b. Use a level to measure the elevation of the mouth of the aqueduct section of the measuring pipe. The first measurement is taken as the initial value h0, and the subsequent measurement is taken as the measured value h1. The elevation of the subsidence floor can be converted, and the difference from the initial value is the foundation settlement. value.
[0029] ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com