Signal timing optimization method of intersection with construction area
A technology of signal timing and optimization method, applied in the direction of traffic signal control, design optimization/simulation, traffic control system, etc., to achieve good travel experience, ensure traffic safety, and optimize signal effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] A signal timing optimization method at an intersection with a construction area, comprising the following content:
[0028] 1. Saturated flow rate module in island construction area
[0029] The saturated flow rate module of the island construction area establishes the car-following model of the island construction area at the intersection, and further proposes a calculation model for the saturation flow rate of the island construction area, and collects data to calibrate the relevant parameters of the model.
[0030] (1) Modeling of vehicle following behavior in island construction area
[0031] Saturated flow rate is a very critical index for timing timing of signalized intersections. In order to calculate the saturated flow rate of island-type construction areas, the present invention considers the characteristics of island-type construction areas and improves the existing car-following model, thereby using to calculate the saturation flow rate in the island constru...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com