A technology with a full life cycle and engineering cost, applied in building construction, electric locks, applications, etc., can solve problems that affect cost coordination, slow coordination speed, and feedback lag, so as to improve construction efficiency and ensure stability , high safety effect

Pending Publication Date: 2020-03-06
浙江求真工程管理咨询有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, since the construction of the project involves multiple units, and the cost will change during the construction process, it is necessary to unify and coordinate among the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-life-cycle engineering cost management method
  • Full-life-cycle engineering cost management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0017] Such as figure 1 , figure 2 As shown, a full life cycle engineering cost management method described in this embodiment includes a management platform, a construction unit terminal, a design unit terminal, a construction unit terminal, and a cost unit terminal. The management platform includes a data storage module, a data processing module, and a data The transmission module, in which the data transmission module is connected to the terminal of the construction unit, the terminal of the design unit, the terminal of the construction unit, and the terminal of the cost unit through a wired or wireless network; the terminal of the cost unit transmits the cost information to the management platform and sets it as a standard, and the terminal of the construction unit, The terminal of the design unit and the terminal of the construction unit transmit the respective costs to the management platform, and the data processing module of the management platform compares them to fo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of engineering cost management, in particular to a full-life-cycle engineering cost management method. The method comprises a management platform, a construction unit terminal, a design unit terminal, a construction unit terminal and a cost unit terminal, wherein the management platform comprises a data storage module, a data processing module and a data transmission module; the construction unit terminal transmits cost information to the management platform and the cost information is served as the standard setting; the construction unit terminal,the design unit terminal and the construction unit terminal transmit the construction cost generated by the construction unit terminal, the design unit terminal and the construction unit terminal to the management platform respectively, and the data processing module of the management platform compares the construction cost with the design cost to form a report and feeds the report back to each unit terminal. Through the full life cycle engineering cost management method obtained by the invention, the cost among various units can be quickly coordinated and fed back through the reasonable design so as to ensure the stability of the cost; and furthermore, the data is confidentially preserved, and the security is high.

Description

technical field [0001] The invention relates to the technical field of project cost management, in particular to a method for managing project cost in a full life cycle. Background technique [0002] The project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. Defined from the perspective of the construction unit, the project cost refers to the construction cost of the project, that is, all the fixed asset investment expenses that are expected to be paid or actually paid for the construction of a project. [0003] However, since the construction of the project involves multiple units, and the construction process will cause changes in the cost, the unity and coordination among the units is required. In the prior art, the coordination speed among various units in the construction process is slow, and the feedback lags behind, which affects the coordination of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): A47B63/00A47B65/00E05B47/02E05B49/00E05B65/52
CPCA47B63/00A47B65/00E05B47/026E05B49/00E05B65/523
Inventor 袁伟庆黄少明周家伟夏峥红杨跃平
Owner 浙江求真工程管理咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products