A kind of permeable brick prepared from serpentine tailings and construction waste and preparation method thereof

A technology of serpentine tailings and construction waste, which is applied in the field of comprehensive utilization of resources, can solve the problems of unreasonable utilization of tailings and construction waste, and achieve the effect of realizing resource recycling, increasing added value, and important economic effects

CN110981396BActive Publication Date: 2021-12-14江苏未名环保科技有限公司
4 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2021-12-14

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention discloses a permeable brick prepared from serpentine tailings and construction waste and a preparation method thereof. The present invention selects serpentine tailings and construction waste as raw materials, carries out crushing, screening, and grading, uses high-efficiency binders and solid waste particles to form moldings, and maintains finished products. The prepared non-sintering permeable bricks are better than the indicators specified in national standards. Requirements, not only can make full use of solid waste serpentine tailings and construction waste, but also greatly increase the added value of solid waste, realize the resource recycling of solid waste, reduce the site resources occupied by landfill, It has important economic, social and ecological significance.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the field of comprehensive utilization of resources, and in particular relates to a permeable brick prepared by using serpentine tailings and construction waste. Background technique

[0002] With the acceleration of the country's urbanization and the expansion of the city's area, the "heat island" and "rain island" effects have increased year by year. The original urban drainage system has been unable to meet the drainage requirements, and the drainage facilities lag behind the urban construction and development. Urban safety drainage A series of problems arose. For example, the sidewalks in urban areas and the impermeable ground of parking lots prevent rainwater from infiltrating, shortening the formation time of urban flood peaks, increasing the total amount and flow velocity of floods, making urban roads impermeable to become the main flood path, and low-lying urban areas are more prone to flooding. The formation of waterl...

Examples

Embodiment 1

[0026] This embodiment relates to a permeable brick prepared from serpentine tailings and construction waste, including a surface layer and a bottom layer.

[0027] The total weight of the surface layer raw materials is 200g, including 80g of serpentine tailings with a particle size of 10-20 mesh, 80g of construction waste with a particle size of 10-20 mesh, 4g of high-efficiency binder, and 36g of silicate binder.

[0028] The total weight of raw materials for the bottom layer is 2000g, including 800g of serpentine tailings with a particle size of 5-10 mesh, 800g of construction waste with a particle size of 5-10 mesh, 40g of high-efficiency binder, and 360g of silicate binder.

[0029] see figure 1 , the preparation method of the above-mentioned permeable brick comprises the following steps;

[0030] 1) The raw materials are crushed by jaw crusher, and the materials are weighed and graded;

[0031] 2) Put the surface layer material into the mold first, pave it on the botto...