Resource management method and system

A technology for managing commands and switching boards, which is applied in the field of communications and can solve problems such as shortage of switching board resources and reduced switching capacity.

Inactive Publication Date: 2020-07-07
ZTE CORP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The embodiment of the present invention provides a resource management method and system to at least solve the problem in the related art that the main board management fun

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource management method and system
  • Resource management method and system
  • Resource management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] figure 1 is a flowchart of a resource management method according to Embodiment 1 of the present invention, such as figure 1 As shown, the process includes the following steps:

[0039] Step S102, the main control board determines that a predetermined trigger condition is established, wherein the predetermined trigger condition includes at least one of the following: receiving a registration message sent by the switching board, receiving a keep-alive message sent by the switching board, The keep-alive message sent by the switching board is not received within the time, and the reset message for resetting the switching board is not received;

[0040] Step S104, the main control board generates a management instruction according to the management policy corresponding to the predetermined trigger condition and sends the management instruction to the switching board, so as to realize the management of the switching board.

[0041] Through this solution, when the predeterm...

Embodiment 2

[0072] In this embodiment, a resource management system is also provided. The system is located in the main control board, and is used to implement the above embodiments and preferred implementation manners. What has already been described will not be repeated. As used below, the term "module" may be a combination of software and / or hardware that realizes a predetermined function. Although the systems described in the following embodiments are preferably implemented in software, implementations in hardware, or a combination of software and hardware are also possible and contemplated.

[0073] figure 2 is a structural block diagram of a resource management system according to Embodiment 2 of the present invention, such as figure 2 As shown, the resource management system 202 is located in the main control board 20, and the resource management system 202 is used for:

[0074] Determining that a predetermined trigger condition is established, wherein the predetermined trigger...

Embodiment 3

[0086] An embodiment of the present invention also provides a storage medium, in which a computer program is stored, wherein the computer program is set to execute the steps in any one of the above method embodiments when running.

[0087] Optionally, in this embodiment, the above-mentioned storage medium may be configured to store a computer program for performing the following steps:

[0088] S1. The master control board determines that a predetermined trigger condition is established, wherein the predetermined trigger condition includes at least one of the following: receiving a registration message sent by the switching board, receiving a keep-alive message sent by the switching board, The keep-alive message sent by the switching board is not received, and the reset message for resetting the switching board is received;

[0089] S2. The main control board generates a management instruction according to the management policy corresponding to the predetermined trigger condit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a resource management method and system. The method comprises the following steps: enabling a main control single board to determine that a preset triggering condition is established, wherein the preset triggering condition comprises at least one of the following conditions: receiving a registration message sent by an exchange single board, receiving a keep-alive message sent by the exchange single board, determining that the keep-alive message sent by the exchange single board is not received within a predetermined time, and receiving a reset message for resetting the exchange single board; and enabling the main control single board to generate a management instruction according to a management strategy corresponding to the predetermined triggering condition and sending the management instruction to the exchange single board so as to realize management of the exchange single board. Through the method and the device, the problems of resource shortage and reducedexchange capability of the exchange single board due to the fact that a main single board management function of the exchange single board needs to be realized by means of a resource management systemin the prior art are solved, the resource management functions of all the exchange single boards are uniformly realized by the main control single board, and the management pressure of the exchange single boards is reduced.

Description

technical field [0001] The present invention relates to the communication field, in particular, to a resource management method and system. Background technique [0002] With the continuous introduction of new-generation communication standards, high requirements are placed on the bandwidth, delay, and jitter of network equipment. In order to meet this requirement, the switching network based on the Packet Transport Network (PTN) bearer technology needs to have larger bandwidth and smaller delay. For PTN equipment, it becomes increasingly important. [0003] In the PTN equipment of the related art, a resource management system is deployed on the main control board, but the management functions related to the switching board still need to be implemented by the resource management system contained in each switching board, and The resource management systems of the switching boards need to be deployed in respective central processing units (Central Processing Units, referred ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04L12/24
CPCH04L41/0631H04L41/082H04L41/0893G06F1/16
Inventor 杨永斌
Owner ZTE CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products