Combination method of vertically telescopic temporary miniature building
A combination method and temporary technology, applied in the direction of residential buildings, buildings, building components, etc., can solve the problems of difficult space height, unfavorable for keeping warm, unfavorable for ventilation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0081] Such as Figure 10-16 , the building structure can stretch or shrink the flexible wall structure 4 according to the actual needs of users to adjust the height of the building, which can be divided into the following four working states:
[0082] Working state-summer working state: At this time, the building needs a larger height to enhance the natural ventilation caused by heat and pressure, making the interior cooler. Figure 10 It is the cross-sectional view of the building in the summer working condition; Figure 11 It is the longitudinal section of the building in summer working condition; Figure 12 It is the cross-sectional view of the skeleton structure in the summer working condition; Figure 13 It is a longitudinal section view of the skeleton structure in summer working conditions.
[0083] Working status 2 Transition season working condition: At this time, the building needs a moderate height to make the indoor temperature suitable. Figure 14 It is a cro...
Embodiment 2
[0087] Such as Figure 17-20 According to the actual needs of users, this building can add intermediate floor slabs 33 in the building to increase the number of building floors. A telescopic ladder needs to be erected at the opening of the middle floor slab 33. Figure 17 is a cross-sectional view of a two-storey building; Figure 18 is a longitudinal section of a two-storey building; Figure 19 A cross-sectional view of the skeleton structure of a two-storey building; Figure 20 It is a longitudinal section view of the skeleton structure of a two-storey building.
[0088] During construction, the following steps can be followed:
[0089] (1) Combined base 1
[0090] A main straight beam (3A) is placed on the ground, and the curved ring beams are spliced into a group of semi-elliptical frames with similar shapes and different sizes. Each group includes the same 2 1 / 2 elliptical curved beams. The two ends of the two 1 / 2 elliptical curved beams in the group are respectiv...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com