Method for installing electronic identity label of prestressed concrete pipe pile and method for managing electronic identity of prestressed concrete pipe pile
A technology of electronic identity tag and concrete pipe pile, which is applied in the management of electronic identity of prestressed concrete pipe pile and the installation field of electronic identity tag of prestressed concrete pipe pile, which can solve the problem of reading distance of electronic identity of reliability pipe pile electronic identity Label anti-metal interference and other issues, to facilitate the analysis of key process quality data, facilitate dynamic inventory management, and improve convenience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] A method for installing an electronic identity tag for a prestressed concrete pipe pile includes the following steps:
[0036] The structure of the prefabricated mounting bracket 100 makes the structure and size of the mounting bracket 100 compatible with the structural size of the bolt hole 310;
[0037] Press the first fixing piece 140 of the mounting bracket 100 into the bolt hole 310, and make the second fixing piece 150 close to the entrance of the bolt hole 310;
[0038] Press the second fixing piece 150 in the mounting bracket 100 into the bolt hole 310 , and make the fixing bottom plate 110 adhere to the metal end plate 300 .
[0039]Wherein, the prestressed concrete pipe pile includes a pipe pile body 200, metal end plates 300 and mounting brackets 100 arranged at both ends of the pipe pile body 200; the metal end plate 300 has a plurality of circumferentially arranged bolt holes 310; the installation bracket 100 includes a fixed bottom plate 110, an electroni...
Embodiment 2
[0062] A method for managing the electronic identity of prestressed concrete pipe piles, which includes the steps of:
[0063] The structure of the prefabricated mounting bracket 100 makes the structure and size of the mounting bracket 100 compatible with the structural size of the bolt hole 310;
[0064] Press the first fixing piece 140 of the mounting bracket 100 into the bolt hole 310, and make the second fixing piece 150 close to the entrance of the bolt hole 310;
[0065] Scan the electronic identity chip 120 that can be read by the first scanning device to write the identity information of the prestressed concrete pipe pile, and assign the process data of the prestressed concrete pipe pile to the identity information;
[0066] Press the second fixing piece 140 in the mounting bracket 100 into the bolt hole, and make the fixing bottom plate 110 stick to the metal end plate 300;
[0067]The two-dimensional code 10 is scanned by the second scanning device to obtain the pro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com