Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Real-time progress management system for engineering construction project

A construction project and progress management technology, applied in the field of real-time progress management system of engineering construction projects, can solve problems affecting the construction period and loss

Active Publication Date: 2020-12-11
中冶南方武汉工程咨询管理有限公司
View PDF9 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, for engineering construction, both parties will set a project duration, and according to the completion of the project duration, whether it conforms to the agreement, but the existing project progress is manually analyzed by some experienced managers Judgment, so as to estimate the completion time of the project, there are some uncertain factors, which will affect the construction period and cause different losses to both parties who signed the agreement. For this reason, we propose a real-time progress management system for engineering construction projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time progress management system for engineering construction project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0036] see figure 1 As shown, the present invention is a real-time progress management system for engineering construction projects, which is characterized in that it includes an acquisition unit, a data processing unit, a database, a progress calculation unit, a construction period arrangement unit, a reminder unit and an intelligent device;

[0037] The collection unit is used to collect project information related to engineering construction, and transmit the pr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a real-time progress management system for an engineering construction project. The real-time progress management system comprises an acquisition unit, a data processing unit,a database, a progress calculation unit, a construction period arrangement unit, a reminding unit and intelligent equipment, wherein the acquisition unit is used for acquiring project information related to engineering construction and transmitting the project information to the data processing unit; wherein the data processing unit is connected with the database, record information related to work of workers is stored in the database, and the data processing unit obtains the record information from the database and processes the record information together with project information. The progress calculation unit performs data calculation on the sorted and marked related data so as to obtain an influence numerical value of the corresponding project construction period, and performs predicted day number calculation on the construction period according to the influence numerical value, thereby improving the accuracy of data calculation, increasing the persuasion of the data, saving the time consumed for analyzing the data and improving the working efficiency.

Description

technical field [0001] The invention relates to the technical field of project progress management, in particular to a real-time progress management system for engineering construction projects. Background technique [0002] Engineering construction is the basic economic activity for the occurrence and development of human civilization, which directly has an important impact on the political, economic, cultural, military and other activities of human society. Since ancient times, engineering construction has been highly valued by the rulers of various countries, and legal means Adjust it, and even use criminal law for the behavior that seriously endangers the country and society. Under normal circumstances, formulating and implementing economic laws is the way and means commonly used by rulers of various countries to adjust engineering construction activities and their social relations. In China, there is a very long history of the emergence and development of specialized l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q10/105G06Q10/1091G06Q50/08
Inventor 谷敏
Owner 中冶南方武汉工程咨询管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products