Problems solved by technology

[0005] The purpose of the present invention is to provide a multi-station high-voltage electric energy metering simulation wiring training cabinet to solve the problem of complex structure of the operation panel of the training equipment in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-station high-voltage electric energy metering simulation wiring training cabinet
  • Multi-station high-voltage electric energy metering simulation wiring training cabinet
  • Multi-station high-voltage electric energy metering simulation wiring training cabinet

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0034] Such as Figure 1 to Figure 4 As shown, the present invention provides a multi-station high-voltage electric energy metering simulation wiring training cabinet, which includes a vertical rectangular cabinet body 1 divided into upper and lower parts, and the four sides of the upper part of the vertical rectangular cabinet body 1 are rotatably connected with Side-opening upper cabinet doors 2, and side-opening lower cabinet doors 3 are installed at the fr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-station high-voltage electric energy metering simulation wiring training cabinet. The training cabinet comprises a vertical rectangular cabinet body divided into an upper part and a lower part, four surfaces of the upper part of the vertical rectangular cabinet body are rotatably connected with side-opening upper cabinet doors, the front end and the rear end of thelower part of the vertical rectangular cabinet body are provided with side-opening lower cabinet doors, an operation panel at the inner side of each of the four upper cabinet doors is mounted on the upper part of the vertical rectangular cabinet body, and a power supply circuit device for supplying power to the four groups of lower cabinet doors is mounted on the lower part of the vertical rectangular cabinet body; and the interior of the upper part of the vertical rectangular cabinet body forms a rectangular structure through the end-to-end staggered distribution of the four groups of operation panels. The operation panels completely simulate the operation environment of a high-voltage three-phase three-wire metering chamber, only an electric energy meter, a combined junction box and connecting wires thereof are arranged, and the four sides of the cabinet body are all practical operation stations. Compared with existing three-station equipment or single-station equipment, more stations are provided.

Description

technical field [0001] The invention relates to the technical field of electric energy simulation devices, in particular to a multi-station high-voltage electric energy measurement simulation wiring training cabinet. Background technique [0002] The safety, reliability and accuracy of electric energy measurement must be guaranteed by instruments and meters that detect electrical parameters such as voltage, current, power factor, and frequency. Therefore, the accurate collection of parameters and the correct form of wiring in electric energy metering work are as important as instruments and meters, and all these tasks need to be completed by electric energy metering personnel, and their professional quality is the top priority of the entire metering work Heavy. [0003] At present, most of the detection and verification work of electric energy metering is based on the analysis of electric energy metering devices, such as voltage transformers (TV or PT), current transformers...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G09B9/00G09B23/18
CPCG09B9/00G09B23/187
Inventor 黄进强贾宏伟吴清华颜永忠单连秋
Owner GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products