Engineering management system based on WBS modeling

A technology of engineering management and engineering components, which is applied in the field of engineering management, can solve problems such as poor intuition, influence on construction plans, and reduce the level of refinement and efficiency of project progress management, so as to facilitate supervision and improve the level of refinement and efficiency.
CN112508525AActive Publication Date: 2021-03-16GUANGXI ROAD & BRIDGE ENG GRP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
Publication Date
2021-03-16

Smart Images

  • Figure 1
    Figure 1
Patent Text Reader

Abstract

The invention relates to the technical field of engineering management, in particular to an engineering management system based on WBS modeling, and the system comprises: a three-dimensional model module which is used for building a BIM three-dimensional model of construction engineering, the BIM three-dimensional model is composed of a plurality of engineering components, and each engineering component builds a WBS structure tree task of engineering quantity; the encoding module that is used for encoding the engineering component; the management platform that is used for managing the construction progress of the engineering component and managing the engineering component according to the encoding module; and the information platform that uses the notification of the planned constructionprogress of the engineering component and the filling of the actual construction progress. According to the engineering management system based on WBS modeling, visual management is carried out on theconstruction plan, the construction progress is convenient to monitor, and it is guaranteed that an engineering project is completed according to quality and quantity.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of engineering management, in particular to an engineering management system based on WBS modeling. Background technique

[0002] Work breakdown structure (WBS for short) is a principle of factorization, which is to decompose a project according to certain principles, decompose the project into tasks, and then decompose the tasks into tasks, and then assign each task to everyone's daily life. During the activity, until it cannot be decomposed. Namely: Project→Task→Work→Daily Activities. The work breakdown structure is deliverable-oriented, grouping project elements, which summarizes and defines the entire scope of work of the project, and each descending level represents a more detailed definition of project work. WBS is always at the center of the planning process and is also an important basis for developing schedule plans, resource requirements, cost estimates, risk management plans, and procurement pla...

Claims