Power construction site-based management and control method and system

A management and control system and power construction technology, applied in special data processing applications, instruments, and other database retrievals, etc., can solve the problems of difficult comprehensive management and control of construction sites, poor actual implementation effects, and difficulties in implementing construction safety management.

Pending Publication Date: 2021-04-02
GUANGZHOU KETENG INFORMATION TECH
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, urban electric power construction has basically realized the informatization of business management and process management, ensuring a certain work efficiency, and the management level of electric power construction is also steadily improving; however, there is still a large gap in the informatization of construction site operations. It is difficult to realize the information management and control of the construction site. With the continuous increase of the country's investment in urban power construction, the number of projects under construction at the same time will be much more than in the past for a long period of time in the future. How to strengthen the quality management of urban power grid construction , continue to carry out project quality improvement activities, promote the transformation of project construction to the direction of standardization, and create safe, high-quality, and environmentally friendly boutique projects, etc., which have become new opportunities and challenges for the power construction industry
[0003] The existing management and control methods and systems based on electric power construction sites have certain disadvantages. First, the degree of project management informatization is not high, which is manifested in the narrow scope of project informatization and low efficiency of sharing and transmission of project-related information; secondly, the construction process control Difficult, that is, "rule by people" management makes it difficult to connect all aspects of construction, and it is difficult to effectively control the construction progress; it is difficult to fully control the construction site by relying on limited on-site inspections; at the same time, it is difficult to effectively control the construction progress, resulting in uncontrolled construction period, thus managing costs Difficult to control; in addition, it is difficult to improve construction quality, the complexity and dynamic characteristics of electric power construction and the "distance" between the construction site and management limit the improvement of construction quality management; finally, it is difficult to implement construction safety management in place, and traditional construction management The method makes the management link easy to become a formality, the actual implementation effect is poor, and the supervision is difficult to fully implement, so it is unknown whether the construction safety management measures and systems can be put in place; for this reason, we propose a management and control method and system based on the electric power construction site

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power construction site-based management and control method and system
  • Power construction site-based management and control method and system
  • Power construction site-based management and control method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] see Figure 1-3 , a management and control system based on the electric power construction site, including the power construction treasure system 1, the power construction treasure system 1 includes the market customer 2 and the construction management module 3, the market customer 2 includes the power grid owner 4 and the general subcontractor 6, and the construction management module 3 includes satisfaction management module 5, personnel management mo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of network power engineering management, and discloses a power construction site-based management and control system, which comprises a power treasure system. The power treasure system comprises market customers and a construction management module. The market customers comprise power grid owners and total subpackage units; the construction management module comprises a satisfaction management module, a personnel management module, a field management module, a quality management module, a safety management module, a progress management module and aperformance management module. The invention further discloses a working method of the management and control system based on the power construction site. According to the management and control method and system based on the electric power construction site, the management level is improved, the cost control is enhanced and the operation cooperation mode of information transparency, process simplification and action standardization is established by utilizing the management mode of Internet + electric power construction, and an informatization communication platform of construction enterprises and owner customers is established by utilizing the Internet technology. Better use prospects can be brought.

Description

technical field [0001] The invention relates to the technical field of network power engineering management, in particular to a management and control method and system based on power construction sites. Background technique [0002] At present, urban electric power construction has basically realized the informatization of business management and process management, ensuring a certain work efficiency, and the management level of electric power construction is also steadily improving; however, there is still a large gap in the informatization of construction site operations. It is difficult to realize the information management and control of the construction site. With the continuous increase of the country's investment in urban power construction, the number of projects under construction at the same time will be much more than in the past for a long period of time in the future. How to strengthen the quality management of urban power grid construction , continue to carry ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08G06F16/904
CPCG06Q10/06313G06Q10/06393G06Q10/06395G06Q50/08G06F16/904
Inventor 梁超慧孔萌贺虎林卫华吴杰刘卓军李家兆苏毅铭汤成辉
Owner GUANGZHOU KETENG INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products