Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Instrument panel-based construction project management system

A project management system and instrument panel technology, applied in the direction of instruments, data processing applications, electrical digital data processing, etc.

Inactive Publication Date: 2018-08-31
SHANGHAI MUNICIPAL ELECTRIC POWER CO
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] With the application of B / S and the popularization of the O2O concept, the traditional method of displaying the dynamics of infrastructure projects with text and tables can no longer meet people's needs. The optimized interface for the data display of infrastructure projects and the real-time update of the displayed data have also become infrastructure projects. Important Technical Problems to be Solved by Project Management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Instrument panel-based construction project management system
  • Instrument panel-based construction project management system
  • Instrument panel-based construction project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] see Figure 1 to Figure 7 In order to better understand the technical solution of the present invention, the inventors of the present invention will describe in detail below through specific embodiments in conjunction with the accompanying drawings:

[0038] see figure 1 , a dashboard-based infrastructure project management system of the present invention includes a database server 12, a WEB management server 13, a mobile application server 14, and at least one smart phone 2 and one PC 3.

[0039] The database server 12, the WEB management server 13, and the mobile application server 14 are all located on the cloud server 1, and the smart phone 2 and the PC 3 are connected to the cloud server 1 through the Internet. Cloud server 1 is rented to reduce costs and ensure system stability. The smart phone 2 can access the cloud server 1 through a wireless router or a mobile network. The PC 3 is connected to the cloud server 1 through a router.

[0040]The database server...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an instrument panel-based construction project management system. The system comprises a database server, a smartphone and a PC machine, wherein the database server is equippedwith a material order database, a financial status database, a construction plan database, a construction progress database and a construction team status database; records taking engineering accounts of construction projects as keywords are built in the material order database, the financial status database, the construction plan database, the construction progress database and the constructionteam status database; a data display system is arranged on the PC machine; and the data display system comprises a project progress plan node instrument panel associated with the construction plan database, a construction team status instrument panel associated with the construction progress database and the construction team status database, a material as-received condition instrument panel associated with the material order database and the construction team status database, and a financial using status instrument panel associated with the financial status database.

Description

technical field [0001] The invention relates to an infrastructure project management system based on a dashboard. Background technique [0002] The current infrastructure project management is to synchronize information through manual maintenance of spreadsheets and dialogue communication. The constructor and the manager are usually not in the same physical space. Therefore, the constructor of the infrastructure project cannot grasp the material order data in real time like the manager. At the same time, the manager cannot grasp the status of the construction team, and the data of the constructor and the manager cannot be synchronized. , It has brought difficulties for the management to arrange the construction plan and the construction party to implement the construction schedule. [0003] At the same time, in the process of infrastructure project management, we are faced with the triadic contradiction of structural shortage of management personnel, increasing number of pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/30G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08G06F16/22G06F16/248
Inventor 董青张子兆庄晟马韬韬肖飞李建宁王大成鲁志豪徐爱蓉张辉浦枢张健袁斐徐琼方祺付慧敏孙俊李洋孙震邓珊珊
Owner SHANGHAI MUNICIPAL ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products